An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro duct cablingat CERN Luit Koert de Jonge/TS-EL-OF

  2. Who are we? • TS-EL-OF section • Luit Koert de Jonge section leader and project manager • Stephane Casenove • Oystein Olsen • Daniel Schamme • Fibre support technician [B1201 contract] • Fibre support technician [B1201 contract] • B1201 optical fibre contract • Supply, installation, testing and commissioning of optical fibre cabling systems Contract signed at CERN 23 July 2003 Micro duct cabling at CERN

  3. no problem! Tony Garcia Installation manager/MZ Ted Sugito Draka Comteq project manager Philippe Pache Mauerhofer & Zuber project manager B1201 contract • Contract with Draka Comteq NKF/NL Supply, installation, testing and commissioning of optical fibre cabling systems Contract now well under way since September 2003 Contract end date 30 June 2006, optionally 2 annual extensions until 2008 Blanket purchase contract of 12’150’000 Sfr. • Ted Sugito Project manager Draka Comteq NKF/Netherlands • Philippe Pache Project manager installation sub-contractor Mauerhofer & Zuber/Switzerland • Tony Garcia Installation manager Micro duct cabling at CERN

  4. Optical cabling with micro ductsWHY? • Blow micro ducts at low cost • Blow micro optical cables on demand • Modular and Flexible • Outdoor resistant • Easy to replace cables • Lower initial cost Micro duct cabling at CERN

  5. Ø 40/50 mm duct 7 x Ø 10 mm guide tubes Capacity 7 x 72=504 optical fibres Ø 32/40 mm duct 5 x Ø 10 mm guide tubes Capacity 5 x 72=360 optical fibres Surface ducts Micro duct cabling at CERN

  6. CMS

  7. LHC surface works Micro duct cabling at CERN

  8. Micro duct cabling at CERN

  9. Beam instrumentation at P32 Micro duct cabling at CERN

  10. Blowing calculations at P32 Micro duct cabling at CERN

  11. Blowing calculations at P32 Micro duct cabling at CERN

  12. Ø 40 mm duct with 10 x Ø 7 mm guide tubes 10 x 24=240 optical fibres Guide tubes replaceable (change size) Ø 25 mm duct with 7 x Ø 7 mm guide tubes Capacity 7 x 24=168 optical fibres Ø 18 mm duct with 3 x Ø 7 mm guide tubes Capacity 3 x 24=72 optical fibres LHC ducts with micro tubes Micro duct cabling at CERN

  13. Optical capacity 10x24+12x7x24= 240+2016=2256 fibres Shaft and tunnel optical ducting Micro duct cabling at CERN

  14. Shaft and gallery optical ducting Beam Instrumentation at PM32 maximum capacity 12x7x24=2016 fibres Micro duct cabling at CERN

  15. SR1-PM15 shaft optical ducting Micro duct cabling at CERN

  16. BI optical fibre cable blowing Micro duct cabling at CERN

  17. Beam instrumentation terminations Micro duct cabling at CERN

  18. Beam instrumentation terminations Micro duct cabling at CERN

  19. Beam instrumentation terminations Micro duct cabling at CERN

  20. Beam instrumentation terminations One 19” rack can contain easily 10x144=1440 fibres, but the handling of patch cords becomes difficult Micro duct cabling at CERN

  21. CMS

  22. Micro duct cabling at CERN

  23. Micro optical fibre cables • Single-mode G.652.B 9/125 optical fibres • For 7 mm micro tubes • 4 • 8 (6) • 12 • 24 • For 10 mm micro tubes (surface installations) • 48 / 60 / 72 (144 under development) • Multimode G.651 50/125 optical fibres • For 7 mm micro tubes • 6 • 12 • 24 Micro duct cabling at CERN

  24. Micro optical fibre cables • Multimode 50/125 optical fibres Various multimode graded index optical fibres are available (produced by Draka Fibre Technology) for 10 Gigabit applications (OM-3 compatible): • Maxcap 150 • Maxcap 300 • Maxcap 550 • A newly developed wideband fibre 650-1310 nm will be available soon for more information http://www.drakafibre.com Micro duct cabling at CERN

  25. Optical termination modules Fibre port 3 (4)U 19” frame for max. 144 fibres Micro duct cabling at CERN

  26. Optical termination equipment Fibre frame 1U 19”for max. 24 fibres Micro duct cabling at CERN

  27. Optical connectors Micro duct cabling at CERN

  28. Optical connectors Micro duct cabling at CERN

  29. Duplex E-2000/APC connector Micro duct cabling at CERN

  30. Optical patch cords • A large variety of patch cords exist in the contract Any optical patch cord can be supplied Micro duct cabling at CERN

  31. Summary • TS-EL-OF and the B1201 contract can provide a professional service to the experiments. • CMS can make use of the contract: • blanket envelope foreseen 1 MSfr. • we need first to define the project(s) • then we can make a precise cost estimate • and we need to make a planning Micro duct cabling at CERN