~. ~. ~. Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler. MVDC Coupler. Remote network part Net3. DG. Network parts. Neighbour network. Voltage course Net3 (worst case). w. Before restructuring. Restructured, Power factor control.
E N D
~ ~ ~ Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler MVDC Coupler Remote network part Net3 DG Network parts Neighbour network Voltage course Net3 (worst case) w Before restructuring Restructured, Power factor control Restructured, Voltage control Fault simulation with DG • Outage time Net 3 • Before restructuring 1,2 h/a • Restructured 0,24 h/a • Restr. & automated 0,03 h/a Synchronous DG – stable continuation Converter connected DG – Synchronisation after fault! Automated sequences required!