1 / 74

2003 Roads Report

2003 Roads Report. Warm Springs Agency. Project Completion Model. Graphic display to show the various phases of project development for the roads program Data includes; Project Name Reservation and Route Number PCAS Accounting Code. Contract Administration. Final Close Out

elvis-young
Download Presentation

2003 Roads Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2003 Roads Report Warm Springs Agency

  2. Project Completion Model • Graphic display to show the various phases of project development for the roads program • Data includes; • Project Name • Reservation and Route Number • PCAS Accounting Code

  3. Contract Administration • Final Close Out • Construction Monitoring • Contract Award

  4. Road Construction DepartmentContract Administration • Final Close Out many old contracts • Completed Construction Monitoring Projects • WSIR 13(4) Wolfe Point (Webster Flat) Road (almost) • WSIR 75(4) Bear Drive • WSIR 803 Aggregate Replacement • BPIR 1(4) Pa’si’go Loop • Completed Contract Award • WSIR 29(3) Upper Dry Creek Road • WSIR 943 Chip Seal Contract • WSIR 804 Aggregate Replacement • WSIR 4001(2) Administration to Health Center

  5. Construction Monitored2003

  6. Wolfe Point DriveWebster FlatP09001 WSIR 13(4)

  7. Wolfe Point Drive (Webster Flat)P09001 WSIR 13(4)

  8. P09001 WSIR 13(4)Asphalt Paving

  9. P09001 WSIR 13(4)Asphalt Paving

  10. P09001 WSIR 13(4)Asphalt Pick-up Operation

  11. Wolfe Point CMP OutletP09001 WSIR 13(4)

  12. P09001 WSIR 13(4)Culvert Bedding

  13. P09001 WSIR 13(4)Compaction of Culvert Bedding

  14. P09001 WSIR 13(4)Compaction Testing

  15. P09001 WSIR 13(4)Hydroseed Operation

  16. Wolfe PointP09001 WSIR 13(4) Broken Cattleguard Wings

  17. Patching P09001 WSIR 13(4) Twin Pipes Fill Settling

  18. Bear Drive EntranceP09352 WSIR 75(4)

  19. Bear Drive (Driveways)P09352 WSIR 75(4)

  20. P09107 WSIR 803

  21. P09107 WSIR 803Aggregate Spreading

  22. P09010 BPIR 1(4)Parking Lot with Old Sidewalk

  23. P09010 BPIR 1(4) Sidewalk Forms

  24. P09010 BPIR 1(4) Paving Along Valley Gutter

  25. P09010 BPIR 1(4) Pa’si’go Loop Parking and Flag Pole

  26. P09010 BPIR 1(4) Pa’si’go Loop

  27. Contracts Awarded2003

  28. Upper Dry CreekP09007 WSIR 29(3)3-Layer BST End of Project Beginning of Project

  29. P09301 WSIR 943 Chip Seal

  30. P09203 WSIR 804 Aggregate Replacement

  31. Administration to HealthP09103 WSIR 4001(2)Proposed New Construction Beginning of Project Replace Fruit Tree Add Sidewalks End of Project Relocate Driveway

  32. Administration to HealthP09103 WSIR 4001(2)Tenino Road Tenino Road (South View) Existing Pedestrian Path Tenino Road (North View) Proposed Pedestrian Path

  33. NEPA/Environmental • Categorical Exclusion • Environmental Assessments • 404 Permits

  34. Road Construction DepartmentNEPA/Environmental Analysis • Understanding the NEPA Process • Finished NEPA using the BIA Categorical Exclusion • WSIR 804 Aggregate Replacement • WSIR 943 Chip Seal (Route 3) • Wrote Draft Environmental Assessments • WSIR 3002(2) Fish Hatchery Junction • WSIR 33(1) County Line Road Bus Route • WSIR 4(8) East Tenino Drainage • WSIR 8(7) Kahneeta Junction • WSIR 49(1) Mill Access Road • WSIR 7B(5) Mill Creek Bank Protection • UIR 900 County Road • BPIR 5(1) Cemetery Road • Applied for a 404 Permit with the US Army Corps of Engineers • WSIR 4001(2) Administration to Health Center

  35. Engineering Design • Update previous plans • Complete New Plans • 50% Review by NWRO • 90% Review by NWRO • Print and stamp final plans

  36. Road Construction DepartmentEngineering Design • Updated Previous Plans • Klamath plans (Phase 2) • WSIR 3002(1) Fish Hatchery Junction • WSIR 8(7) Kahneeta Junction • UIR 900 County Line Road • WSIR 804 Aggregate Replacement • WSIR 943 Chip Seal (Route 3) • Completed New Plans • WSIR 33(1) County Line Road • WSIR 4(8) East Tenino Drainage • WSIR 7B(5) Mill Creek Bank Protection

  37. Survey and Right-of-way • Topo Survey • Property Line Location • Prepare Right-of-way plat

  38. Road Construction DepartmentSurvey and Right-of-ways • Accomplished control survey for Neah Bay • Established Control Network for Warm Springs • Surveyed 11 New Projects (Topo and Property Lines) • WSIR 33(1) County Line Road • WSIR 51(2) Simnasho Subdivision • WSIR 24(6) Seekseequa Subdivision • WSIR 13(5) Culpus Turn Lane • WSIR 15(1) Sidwalter Flat • WSIR 7B(5) Mill Creek Bank Protection • WSIR 4(6) East Tenino Drainage • Wolfe Point to Kahneeta • WSIR 241(2) Dry Creek Extension • WSIR 75(6) Greeley Heights Second Access • WSIR 53(8) Hollywood/Tenino Round-a-bout

  39. Warm Springs Survey NetworkCurrent Status • 48 Permanent Monuments (Three Mile Radius Approx) • 23 Previous (USGS/FHWA/ODOT/BIA) • 25 New (BIA GPS control points) • Yields 5 calibrated sites for RTK survey on reservation • 46 Elevation Control Points (Historical data BAD!!!) • 240 Section and Quarter Corners (PLSS) • 814 Property Pins (Subdivision Lot Corners) • Next year we will try to get historical data from old Unix based Mountain Top Software to TGO (Trimble Geometrics Office) and Autocad format for campus area of reservation.

  40. Warm Springs RTK Base Network

  41. Warm Springs Reservation Survey Base Stations

  42. NGS Survey Monument COYOTE

  43. USGS Monument 50+ years old Grouted in rock 4 Inch Pipe in soil

  44. BIA Permanent MonumentNote fencepost to aid in finding station license number, and date stamp.

  45. PLSS Brass Cap (Section Corner)(Public Land Survey System) Used for GPS photo control by GIS department Poor GPS survey control Pipe wiggles when pushed by animals Unknown Origin (Not linked to original GLO notes)

  46. Bad GPS Control PointSubdivision Lot Corner Position not stable over time. Too easy to move monument.

  47. Trimble RTK Base Station • 4700 Base Receiver set up over monument with broadcast antenna and car battery power supply

More Related