2003 Roads Report. Warm Springs Agency. Project Completion Model. Graphic display to show the various phases of project development for the roads program Data includes; Project Name Reservation and Route Number PCAS Accounting Code. Contract Administration. Final Close Out
E N D
2003 Roads Report Warm Springs Agency
Project Completion Model • Graphic display to show the various phases of project development for the roads program • Data includes; • Project Name • Reservation and Route Number • PCAS Accounting Code
Contract Administration • Final Close Out • Construction Monitoring • Contract Award
Road Construction DepartmentContract Administration • Final Close Out many old contracts • Completed Construction Monitoring Projects • WSIR 13(4) Wolfe Point (Webster Flat) Road (almost) • WSIR 75(4) Bear Drive • WSIR 803 Aggregate Replacement • BPIR 1(4) Pa’si’go Loop • Completed Contract Award • WSIR 29(3) Upper Dry Creek Road • WSIR 943 Chip Seal Contract • WSIR 804 Aggregate Replacement • WSIR 4001(2) Administration to Health Center
Upper Dry CreekP09007 WSIR 29(3)3-Layer BST End of Project Beginning of Project
Administration to HealthP09103 WSIR 4001(2)Proposed New Construction Beginning of Project Replace Fruit Tree Add Sidewalks End of Project Relocate Driveway
Administration to HealthP09103 WSIR 4001(2)Tenino Road Tenino Road (South View) Existing Pedestrian Path Tenino Road (North View) Proposed Pedestrian Path
NEPA/Environmental • Categorical Exclusion • Environmental Assessments • 404 Permits
Road Construction DepartmentNEPA/Environmental Analysis • Understanding the NEPA Process • Finished NEPA using the BIA Categorical Exclusion • WSIR 804 Aggregate Replacement • WSIR 943 Chip Seal (Route 3) • Wrote Draft Environmental Assessments • WSIR 3002(2) Fish Hatchery Junction • WSIR 33(1) County Line Road Bus Route • WSIR 4(8) East Tenino Drainage • WSIR 8(7) Kahneeta Junction • WSIR 49(1) Mill Access Road • WSIR 7B(5) Mill Creek Bank Protection • UIR 900 County Road • BPIR 5(1) Cemetery Road • Applied for a 404 Permit with the US Army Corps of Engineers • WSIR 4001(2) Administration to Health Center
Engineering Design • Update previous plans • Complete New Plans • 50% Review by NWRO • 90% Review by NWRO • Print and stamp final plans
Road Construction DepartmentEngineering Design • Updated Previous Plans • Klamath plans (Phase 2) • WSIR 3002(1) Fish Hatchery Junction • WSIR 8(7) Kahneeta Junction • UIR 900 County Line Road • WSIR 804 Aggregate Replacement • WSIR 943 Chip Seal (Route 3) • Completed New Plans • WSIR 33(1) County Line Road • WSIR 4(8) East Tenino Drainage • WSIR 7B(5) Mill Creek Bank Protection
Survey and Right-of-way • Topo Survey • Property Line Location • Prepare Right-of-way plat
Road Construction DepartmentSurvey and Right-of-ways • Accomplished control survey for Neah Bay • Established Control Network for Warm Springs • Surveyed 11 New Projects (Topo and Property Lines) • WSIR 33(1) County Line Road • WSIR 51(2) Simnasho Subdivision • WSIR 24(6) Seekseequa Subdivision • WSIR 13(5) Culpus Turn Lane • WSIR 15(1) Sidwalter Flat • WSIR 7B(5) Mill Creek Bank Protection • WSIR 4(6) East Tenino Drainage • Wolfe Point to Kahneeta • WSIR 241(2) Dry Creek Extension • WSIR 75(6) Greeley Heights Second Access • WSIR 53(8) Hollywood/Tenino Round-a-bout
Warm Springs Survey NetworkCurrent Status • 48 Permanent Monuments (Three Mile Radius Approx) • 23 Previous (USGS/FHWA/ODOT/BIA) • 25 New (BIA GPS control points) • Yields 5 calibrated sites for RTK survey on reservation • 46 Elevation Control Points (Historical data BAD!!!) • 240 Section and Quarter Corners (PLSS) • 814 Property Pins (Subdivision Lot Corners) • Next year we will try to get historical data from old Unix based Mountain Top Software to TGO (Trimble Geometrics Office) and Autocad format for campus area of reservation.
USGS Monument 50+ years old Grouted in rock 4 Inch Pipe in soil
BIA Permanent MonumentNote fencepost to aid in finding station license number, and date stamp.
PLSS Brass Cap (Section Corner)(Public Land Survey System) Used for GPS photo control by GIS department Poor GPS survey control Pipe wiggles when pushed by animals Unknown Origin (Not linked to original GLO notes)
Bad GPS Control PointSubdivision Lot Corner Position not stable over time. Too easy to move monument.