MaSSENA LATERAL BRIDGE SLIDE CASE STUDY. Jim Nelson, Iowa DOT. Project location. IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148. Project location. Existing structure. 40’ x 30’ Steel I-beam Constructed 1930 Reconstructed 1949 Overlay 1968 Retrofit rail 1992 Overlay 1998.

elwyn
Download Presentation

MaSSENA LATERAL BRIDGE SLIDE CASE STUDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MaSSENA LATERAL BRIDGE SLIDE CASE STUDY Jim Nelson, Iowa DOT
  2. Project location IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148
  3. Project location
  4. Existing structure 40’ x 30’ Steel I-beam Constructed 1930 Reconstructed 1949 Overlay 1968 Retrofit rail 1992 Overlay 1998
  5. Existing structure Structurally deficient – sufficiency rating is 38.2 Bridge is not adequate for legal loads – posted “One truck at a time.”
  6. Proposed replacement bridge Pretensioned Prestressed Concrete Beam Bridge
  7. Mobility impacts Detour traffic for duration of construction 7 miles out of distance travel for detour AADT (2012) – 1,460 w/ 16% trucks User costs for 180 day detour Indirect $437,000 Direct $15,000 (Co. Road Maint. & Detour Signing)
  8. Project staging area
  9. Utah DOT WANSHIP BRIDGE SLIDE
  10. Bridge construction visualization
  11. Semi-integral abutment Abutment Diaphragm Details – sheet number 14
  12. Sliding pad Superstructure Details – sheet number 15 Bonded PTFE surface on bearing pad detail
  13. Project cost Let April 16, 2013 Winning bid $1.3 Million Bridge unit cost - $112/SF Historic bridge unit cost - $85/SF
  14. Critical closure schedule
  15. Massena lateral bridge slide web site
  16. Construction progress
  17. acknowledgements Designer – Iowa DOT Constructability Review – Michael Baker Corporation ABC Peer Exchange – Utah DOT ABC Detail Testing – Iowa State University Construction Administration – Iowa DOT Prime Contractor – Herberger Construction Co., Inc. Precast Wing Supplier – Cretex Concrete Products Precast Beam Supplier – Cretex Concrete Products HfL Grant – FHWA