1 / 1

R2E Point 1 relocation new proposal 5 th April 2011

R2E Point 1 relocation new proposal 5 th April 2011. Y. Muttoni, 05/04/2011. RYLC 01. RYLB 01. RYSC 01. B. QYC 02. C. RYCA 01 RYCA 02. QYC 01 (additional rack). RYMCB 01-04. A. 2 Power Converters. distance A-B= 18.5m distance A-C= 25m. DYPG 01 CYCIP 01. Fire detectors.

Download Presentation

R2E Point 1 relocation new proposal 5 th April 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. R2E Point 1 relocation new proposal 5th April 2011 Y. Muttoni, 05/04/2011 RYLC 01 RYLB 01 RYSC 01 B QYC 02 C RYCA 01 RYCA 02 QYC 01 (additional rack) RYMCB 01-04 A 2 Power Converters distance A-B= 18.5m distance A-C= 25m DYPG 01 CYCIP 01 Fire detectors DYPG 02 TYCFL 01 to be relocated in US15 level 2 close to TYCCR01 rack DYXA 01

More Related