1 / 16

John Hooper, PE, SE Chair, ASCE 7 Seismic Subcommittee

Translating the 2009 NEHRP Provisions into ASCE/SEI 7-10 Presented at the 2010 BSSC Annual Meeting/Workshop. John Hooper, PE, SE Chair, ASCE 7 Seismic Subcommittee. Code Development Process. Research Results / Lessons Learned. Joint Correlating Committee. Industry Standards.

emile
Download Presentation

John Hooper, PE, SE Chair, ASCE 7 Seismic Subcommittee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Translating the 2009 NEHRP Provisions into ASCE/SEI 7-10Presented at the 2010 BSSC Annual Meeting/Workshop John Hooper, PE, SE Chair, ASCE 7 Seismic Subcommittee

  2. Code Development Process Research Results / Lessons Learned Joint Correlating Committee Industry Standards FEMA Guidance (NEHRP Provisions ) (major?) (major) CRSC (reality check) ASCE/SEI Standards (7, 31 and 41) (minor?) (minor) International Codes (reality)

  3. ASCE 7 Seismic Subcommittee (SSC) • Comprised of over 50 Members • Essentially a “Balanced” Committee • Organized by Technical Committees (TC) • Reports to ASCE 7 Main Committee • Follows ANSI Consensus Process • Coordinated Efforts with Material Standards

  4. ASCE 7 Seismic Subcommittee (SSC) • TC-1 Ground Motions—C.B. Crouse • TC-2 General Provisions—Jon Kiland • TC-3 Foundations/Site Conditions—Martin Johnson • TC-4 Concrete—Neil Hawkins • TC-5 Masonry—Jason Thompson/Phil Samblanet • TC-6 Steel & Composite Structures—Rafael Sabelli/Bonnie Manley

  5. ASCE 7 Seismic Subcommittee (SSC) • TC-7 Wood & Light-Framed Structures—Phil Line • TC-8 Non-Structural Components—John Silva • TC-9 Administrative & QA Provisions—Jon Siu • TC-12 Seismic Isolation & Damping—Andrew Whittaker • TC-13 Non-Building Structures—Greg Soules • Ad-hoc Anchorage Task Group—Jim Harris • Ad-hoc Ground Motion Task Group—Charlie Kircher

  6. ASCE 7 Seismic Subcommittee (SSC) • Process Affected by ICC Schedule Change • Coordinated Efforts with Material Standards to the Extent Possible (Chapter 14 “Clean-up”) • Processed over 200 Proposals

  7. 2009 Provisions Proposals Translated—Part 1 • Ground Motion Maps and Terminology (to be covered by Nico Luco) • Geologic Hazards and Geotechnical Investigations • Section 11.8 was updated consistent with Provisions language • Includes new PGA maps • Introduced MCEG terminology to distinguish “geo-mean” values from risk-targeted MCER values

  8. 2009 Provisions Proposals Translated—Part 1 • Table 12.2-1—Items Changed • Ordinary reinforced AAC masonry shear walls • Plain AAC masonry shear walls • Cold-formed steel special bolted frame • Table 12.2-1 • Consolidation of EBF and BRBF into one system for each

  9. 2009 Provisions Proposals Translated—Part 1 • Table 12.6-1, Permitted Analytical Procedures • Simplified table in a similar fashion • Included 160-foot height as part of the check • Transfer of Diaphragm Proposal, Along with Other External Proposals, Resulted in Ad-hoc Anchorage Task Group

  10. 2009 Provisions Proposals Translated—Part 1 • Chapter 14, Material Specific Design and Detailing Requirements • Many of the suggested changes were adopted • Table 15.4.2—Items Changed • Separate line item for chimney and stacks was added

  11. 2009 Provisions Proposals Translated—Part 1 • Section 15.7.6, Ground-Supported Storage Tanks for Liqueds • Exception for determining site-specific Sac was added • Section 16.1.3.2 Three-Dimensional Analysis • Similar changes to the scaling requirements were incorporated

  12. 2009 Provisions Proposals NOT Translated—Part 1 • Section 12.8.7 P-Delta Limits • Section 12.11.2.2.1, Transfer of Anchorage Forces into Diaphragm • Section 12.14.7.5.1, Transfer of Anchorage Forces into Diaphragm

  13. 2009 Provisions Proposals Translated—Part 2 • Develop Commentary to ASCE 7-05 • Completion date: 4th quarter 2010 • Develop Commentary to ASCE 7-10 • Use ASCE 7-05 Commentary as a basis • Add commentary for the changes associated with ASCE 7-10 • Completion date: not yet determined

  14. 2009 Provisions Proposals Translated—Part 3 • Adoption of Chapter 16 discussed but not moved forward

More Related