1 / 11

TR 10

8P22. 8P21. 8P20. 8P25. 8P24. 8P23. 345kV Bus 2. 345kV Bus 1. 8P28. 8P27. PT. PT. Red Rock Subtation. TR 10. K5. 943. 115kV.

emma-harvey
Download Presentation

TR 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 8P22 8P21 8P20 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV 10/31/2005, At Red Rock Substation, the switching procedure (TWR 814013) called for the isolation of the Red Rock 345kV bus #2 so that a C-phase lightning arrestor could be installed. The arrestor had failed during an earlier event on 10/4/2005. During this switching procedure, something caused high voltages on Bus 2 and the A & B phase pot transformers vented significant amounts of oil.

  2. 8P22 8P21 8P20 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV The relay potentials have been placed on the Bus 1 position and the pot paralleling switch has been turned off. The dispatcher has opened two 115kV breakers and two 345kV breakers. Everything appears normal at this point. The next step is to de-energize the 345kV Bus #2 by opening 8P22.

  3. 8P22 opened to de-energize the 345kV bus 2. Va goes to 68% Vb stays at nominal Vc goes to 48% No harmonics present. What is keeping the Bus 2 B-phase PT at nominal voltage? 8P22 8P21 8P20 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened

  4. TR10 MOD opened. Va jumps to 131% Vb stays at nominal Vc rises to 55% No harmonics present. Slow speed record only. 8P22 8P21 8P20 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 8P22 Opened (shown on prev. slide.)

  5. 8P22 A MOD opened. Va dips to 127% Vb jumps to 128% Vc drops to 44% Va & Vb have significant harmonics now. Slow speed record shown here, next slide shows high speed record of this same switching. 8P22 8P21 8P20 A 8P25 8P24 8P23 345kV Bus 1 345kV Bus 2 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened

  6. 8P22 A MOD opened. Va drops to 127% Vb jumps to 128% Vc drops to 44% Va & Vb have significant harmonics now. High speed record shows harmonics. 8P22 8P21 8P20 A 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened

  7. What caused Va to drop to 50% of nominal 18 minutes after the last switching occurred? No operator actions are known to have occurred around this time. Vb is still at 127% with harmonic distortion. 8P22 8P21 8P20 A 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50%

  8. What caused Vb to drop to 41% of nominal 26 minutes after last switching. No switching was recorded at this time. All three voltages are at approximately 40%. Smooth waveforms are present. At the start of this record, Va and Vc contain harmonics. 8P22 8P21 8P20 A 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50% 07:42:08 Vb drops to 41%

  9. 8P22 8P21 8P20 A 8P25 8P24 8P23 345kV Bus 2 345kV Bus 1 8P28 8P27 PT PT Red Rock Subtation TR 10 K5 943 115kV Next steps? We need to understand what happed here. In talking with the maintenance department, it seems like the two theories that could explain the bus energization are the grading capacitors on the ABB HPL 362A2 breakers or some problem with the pot paralleling scheme is allowing backfeed. More testing, investigation, and possibly ATP study work is needed!!!! Sequence of Events: 07:15:14 8P22 opened 07:15:40 TR 10 MOD opened 07:16:18 8P22 A MOD opened 07:34:16 Va drops to 50% 07:42:08 Vb drops to 41%

  10. RRK 345kV HPL breakers with external grading capacitors.

  11. RRK 345kV Wire wound potential transformers on Bus 2. A & B phase units blew oil out of their tops.