1 / 17

April 8, 2014 | NEPOOL markets committee

April 8, 2014 | NEPOOL markets committee. Jonathan Lowell. Principal analyst | market development. Updates to Market Rule 1 and Appendix F.3 to Address the New NCPC Payments Design. NCPC Cost Allocation –Conforming Changes.

emmly
Download Presentation

April 8, 2014 | NEPOOL markets committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. April 8, 2014 | NEPOOL markets committee Jonathan Lowell Principal analyst | market development Updates to Market Rule 1 and Appendix F.3 to Address the New NCPC Payments Design NCPC Cost Allocation –Conforming Changes

  2. Background – Conforming and Cleanup Changes are Required in Several Areas Related to EMOF and NCPC • ISO is grouping these changes into two projects: • All changes related to Appendix F NCPC cost allocation will be included under the NCPC Cost Allocation: Phase 1 project • Conforming changes that do not modify the NCPC cost allocation are described in this presentation • The Phase 1 Cost Allocation changes are discussed in a separate presentation as part of the same April MC agenda item • All changes related to Market Rule 1, Appendix A and Appendix F (NCPC payments) will be included under the Energy Market Offer Flexibility Conforming Changes project • This topic will be presented in a separate agenda item at the April MC Meeting

  3. Conforming Changes Required for NCPC Cost Allocation – Appendix F • Existing language in III.3.2.3 is being consolidated into Appendix F – NCPC • Some portions were incorporated into F.2 NCPC Credits, but not removed from III.3.2.3 at that time. • One provision with general applicability will be moved into F.1 • Portions related to NCPC cost allocation will be removed from III.3.2.3 and pulled into Appendix F.3 Charges for NCPC • Appendix F becomes “home sweet home” for all things     NCPC-related in Market Rule 1 • The new NCPC Payments design eliminates Minimum Generation Emergency (MGE) Credits as a separate NCPC credit calculation. • This requires conforming changes in Appendix F.3 so as to not impact how MGE costs are allocated

  4. Overview of Min Gen Emergency NCPC – Old Design • The “old” MGE credit compensated generators that were dispatched up out of rate by the ISO during a MGE, when most resources are being dispatched to their Emergency Min, and RTLMP is administratively set to $0/MWH • The cost of MGE credits was allocated to Real-Time Generation Obligations (RTGO), excluding any Exempt RTGO • Exempt RTGO = RTGO – EcoMin energy (i.e. the out-of-merit dispatch requested by the ISO)

  5. Overview of MGE NCPC – New Design • In the “new” NCPC Payments design, out-of-rate dispatch is addressed by the Real-Time Dispatch Credit, which compensates resources when dispatched by the ISO to operate out of rate, including during an MGE • To avoid any change in NCPC cost allocation, RT Dispatch Credits during a MGE must be accumulated separately for allocation to RTGO excluding exempt RTGO • To abuse the famous words of William Shakespeare, “A Min Gen Emergency Credit by any other name would still smell as sweet [and still be allocated like a Min Gen Emergency Credit].”

  6. Overview of MGE NCPC – New Design • To accomplish these changes: • Minimum Generation Emergency Credits are redefined in terms of Real-Time Dispatch Credits during a MGE • Definition of Exempt RTGO is eliminated • Rather than referring to Exempt RTGO, tariff language will instead refer to “RTGO during an MGE that is eligible for a RT Dispatch NCPC Credit”

  7. Conforming Changes to Address MGE Cost Allocation • MGE Credit definition modified to conform to new NCPC Payments terminology • Definition of Exempt RTGO eliminated, but the same concept still applies • Definition of MGE Charge eliminated – not used or referred to anywhere • Appropriate sections of Appendix F.3 rewritten for clarity, but allocation is unchanged.

  8. Appendix F.3 is Rewritten to Provide Consistency with the New Appendix F.2 and to Improve Clarity • The rewrite makes no changes to how NCPC costs are allocated • It does consolidate language from III.3.2.3 into one convenient location • The rewritten App F.3 will no longer require a secret decoder ring to parse sentences like: “The ISO calculates for each Operating Day the non-Postured non-Synchronous Condenser related, Synchronous Condenser related, non-Local Second Contingency Protection Resource related, non-Regulation and non-SCR related economic NCPC Charges for the Real-Time Energy Market for each Market Participant …”

  9. Summary of Changes in Appendix F

  10. Summary of Changes in Appendix F

  11. Summary of Changes in Appendix F

  12. Summary of Changes in Appendix F

  13. Summary of Changes in Appendix F

  14. Summary of Changes to Appendix F.3

  15. Summary of Changes to Appendix F.3

  16. Summary of Changes to Appendix F.3

  17. Next Steps • Tariff review will follow the stakeholder schedule for the NCPC Cost Allocation Phase 1 • These tariff changes will be voted as part of the NCPC Cost Allocation Phase 1 • Request MC vote at May meeting • Targeted for Q4 2014 effective date • Coincident with Energy Market Offer Flexibility and new NCPC Payments implementation • No implementation concerns for the F.3 rewrite, because these changes do not alter the settlement of NCPC Charges.

More Related