Consortium Meeting 6/7 Sept 2006. Verification Control User Manual H.Aarts. HIFI Verification Control Matrix. The HIFI VCM is being established based on: Test Reports and Procedures from EIDPs RFW and CN status NCR status. HIFI Verification Control Matrix.
E N D
Consortium Meeting 6/7 Sept 2006 Verification Control User Manual H.Aarts
HIFI Verification Control Matrix • The HIFI VCM is being established based on: • Test Reports and Procedures from EIDPs • RFW and CN status • NCR status
HIFI Verification Control Matrix • QM: Focus on Environmental qualification, Input for Instrument Qualification Review • Status: Complete (including both QM and PFM approaches) • FCU; some delta qualifications outstanding • LCU; some delta qualifications outstanding • LSU; Qualification in progress • FPU; VCM to be completed • LOU; VCM to be completed
HIFI Verification Control Matrix • FM: Focus on performance Input for Delivery Review • Status: in progress
HIFI User Manual • This manual describes the HIFI instrument from an operational point of view.Intended for operators not intimately familiar with HIFI (Astrium, ESOC, ....) • This manual is compiled from Unit and Sub-system User Manuals, Design Descriptions, etc.
HIFI User Manual • Volume 1, describes the instrument in terms of functionality, interfaces and operational concepts. • Volume 2, describes the operational aspects and procedures of the instrument. The procedures are based on the CUS-scripts defined to set the instrument in the various modes and configurations as required during testing of the HIFI flight instrument. • Annex 1, provides detailed information about the commanding and housekeeping data and packets as defined in the HIFI Mission Information Base (MIB). • Annex 2, provides the detailed listings of the CUS-scripts as used in the operational procedures.
HIFI User Manual • Status: • Issue 1, released Sept. 2004 Instrument functional description and operational concepts • Issue 1.4, released Jan. 2006 Operational procedures • Issue 2, in progress Contingency procedures and operational constraints
HIFI User Manual • Contingency ProceduresFrom User Manuals, FMECA, FDIR, HSIA, etc • Operational ConstraintsFrom User Manuals, Requests For Waiver, Change Notices, Non-Conformance Reports, etc.
HIFI User Manual • Recent examples of Operational Constraints: • 10 Minute waiting time between power-down and power-up to recharge FPGAs • Possible temperature constaints for certain frequency ranges in the LSU • Request: If any additional constraints comes up, Let me know!!