RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR. PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD. DEVELOPMENT ON ANNUAITY MODEL. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16). PROJECT LOCATION.

emmly
Download Presentation

RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD DEVELOPMENT ON ANNUAITY MODEL

  2. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) PROJECT LOCATION Page 2

  3. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) NECESSITY • Improved connectivity • Development of the surroundings • A boost to tourist Golden Triangle of Rajasthan – Jodhpur to Udaipur • Shorter connection for Jodhpur with Udaipur Page 3

  4. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) LENGTH (Km) • Total Length of main Link is 91.450 Km • Details of Proposed Bypasses Given below, Page 4

  5. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) SCOPE • Preparation of Detailed Project Report • Site reconnaissance • Road Inventory • Pavement Condition • Soil Investigation • Topographical Survey • Improvement Proposal • Finalization of Bypass Alignment • Detailed Design of Geometrics, Pavement & Structures • Detailed design of Road Appurtenances • Preparation of BOQ • Calculation of Annuity Page 5

  6. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING WIDTH PRESENT STATUS Page 6

  7. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) VILLAGES ENROUTE PRESENT STATUS Page 7

  8. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) CEMENT CONCRETE ROAD PRESENT STATUS Page 8

  9. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING CRUST PRESENT STATUS Page 9

  10. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) STRUCTURES Causeway Culverts PRESENT STATUS Page 10

  11. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Minor Bridges PRESENT STATUS Page 11

  12. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Major Bridges PRESENT STATUS Page 12

  13. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) ESTIMATED OVERLAY PROPOSED DEVELOPEMENT Page 13

  14. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) LIST OF REPLACED BRIDGES PROPOSED DEVELOPEMENT Page 14

  15. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) PROPOSED BYPASS PROPOSED DEVELOPEMENT Page 15

  16. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Project Cost – 174 Cr. (Mainline 121 Cr. + Bypasses 29 Cr. + Str . 24 Cr.)Construction Period – 2 YearsConcession Period – 20 YearsAnnuity - Page 16

  17. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) TRAFFIC Page 17

  18. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) RAILWAY CROSSING & ROB A Broad Gauge Railway Track Crosses the Project Corridor at Chainage Km 28+555 near Somesar Village. No ROB has been Proposed along this Road . Page 18

  19. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Toll palza locationS

  20. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) DATE OF SUBMISSION OF DPR Page 20

  21. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) LIKELY DATE OF START OF WORK Page 21

  22. TAKE OFF STARTING AT RAMASIYA, KM 29+000 TAKING OFF FROM NH14, KM 115+000 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Page 22

  23. CANAL CROSSING REALIGNMENT PROPOSED ON RIGHT PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) SHARP CURVE Page 23

  24. FIRST VILLAGE ON THE ALIGNMENT- HEMAWAS EARTHEN BUND ON LEFT HABITATIONON RIGHT SIDE ONLY PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Page 24

  25. BYPASS CANDIDATE – SONAI MAJI CONJETION INSIDE EARTHEN BUND ON RIGHT PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Page 25

  26. BYPASS CANDIDATE –VILLAGE SODAWAS VILLAGE SODAWAS JUST FIT FOR 10M PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Page 26

  27. BYPASS CANDIDATE – VILLAGE BUSSI VILLAGE BUSSI – BYPASS CANDIDATE VILLAGE BUSSI – FROM INSIDE PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Page 27

  28. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) DANGEROUS CURVE End chainage at 77+000 Starting chainage at 69+000 Page 28

  29. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) INDEX MAP Page 29

  30. PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) THANK YOU Page 30