MATERIALS CERTIFICATION PROCESS Step by Step
Step by Step • Navigation steps • Screen shots of key windows • Start off in SiteManager • Material Certification Process Utility Index • Run Reports for a contract • Material Certification Letter
Before we begin….. • Material Certification Process?? • Collection of reports • Microsoft Access Queries Summaries of issues related to material sampling and testing activities on a contract.
What Reports are available? • Material Certification Letter • Summary of Failing Samples • Summary of materials on items accepted by Small Quantity • Summary of Independent Assurance • Other Summaries – Looks for errors or documentation problems concerning SiteManager Materials.
Materials Certification Process Utility Index • Link to the Policies and Procedures • The Material Certification Letter • Correction Reports • Attachments to the Mat’l Cert. Letter • Additional Tools
First Indicator to Look at:Pending Change Orders? Approval of a change order can affect Material Sampling & Testing Requirements:
Correction Reports • (9) Un-authorized Samples • (8) Incomplete templates – (“No Data Templates” indicator.) Identify and correct any missing documentation in sample records.
Fix Un-authorized samples • Complete any Residency samples (or void them out if not needed) • Contact Materials Division, if they still have any unreported samples. • Re-run the Audit indicator report and verify column 9 is now un-checked.
Additional Info…. • Policy & Procedure 1302.1G • “No Data in Key Contract Test Templates Report” • “A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: • The indicator may not remain on the final Materials Certification Letter • Sample records are to be revised and appropriate test results added to remove this indicator from the Materials Certification Letter”
Review so far…. • No pending change orders. • All correction reports are fixed: • No unauthorized samples • No empty templates
Next: What Reports do we need to Attach to Material Certification Letter ? • Material Audit concern indicator report - OR - • Material Certification Letter Look at the………
- OR - Screen shot: a portion of the material cert letter.
Small Quantities Report Screen shot: from Material audit concern indicator report - OR - Screen shot: a portion of the material cert letter.
Small Quantity Acceptance: • Policy and Procedure 1302.1A • “Small Quantities Acceptance Report” “Anyone responsible for printing or viewing this report, and/or anyone responsible for issuing a Material Certification Letter or auditing a contract shall be familiar with the information in the quick reference guide (QRG);” LINK
Small Quantity QRG • Do not use this method when you are actually conducting Sampling and Testing on a material. For Example: • 1. to avoid the last sample • 2. multiple tests on a material • 3. Failing materials
Small Quantity QRG • Step by step instructions • Screen shots of key points
Failed & Accepted Report • Review Policy 1302.1B • “Failed and Accepted Materials Report” • “A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: • The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: • Remarks should be included indicating what failed, and the basis for acceptance. • The correct material quantity should be indicated • Proper authorization should be indicated. (see additional discussion) • Use of material listed as Failed & Accepted should be within the guidelines and policies established in the Residency and Division.”
IAS Does Not Compare No report needed for this indicator.
IAS Does Not Compare Review: • Policy 1302.1E • “IAS Does Not compare fav. Report” • “A review of this report prior to issuance of the Material Certification Letter should focus on the following issues: • The indicator may remain on the final Materials Certification Letter with this report attached as the required documentation, however: • Remarks (General by IAS) should indicate what did not compare • Remarks (Disposition by Residency) should indicate how the non-comparison was addressed”
Additional Tools • Contract Sample summary report: • Can be ran anytime. • No filters – shows all project samples. • Failed Materials Report: • Sample status = Fails
Material Certification Letter • Material Cert Process Utility Index • Select Contract and Print • Review the indicators • Verify (look at the indicators): • No unauthorized samples exist • No material test templates are blank • Attach necessary Reports • Signed & Sealed by Resident Engr.