340 likes | 502 Views
Flight Readiness Review March 29, 2013. Overview. 1. Launch Vehicle – Full Scale 3. Recovery a) Design and Verification of LV a) Electrical Schematics b) Fullscale Flight Results b) Avionics c) Mission Performance c) Parachutes and
E N D
Flight Readiness Review March 29, 2013
Overview • 1. Launch Vehicle – Full Scale 3. Recovery • a) Design and Verification of LV a) Electrical Schematics • b) FullscaleFlight Results b) Avionics • c) Mission Performance c) Parachutes and • Results Separation Charges • d) Payload Integration d) Safety and Testing • e) Safety and Testing • 4. Payload (DCAP) • 2. Motor Selection a) Design of Payload • a) Motor Specifications Experiment • b) Thrust to Weight Ratio b) Science Value • c) Rail Exit Velocity c) Safety and Testing • d) Safety and Testing
Overview 5. Project Plan a)Timeline and Milestones b)Educational Engagement 6. Conclusion a)Progression towards Huntsville
1. Launch Vehicle A. Design and Verification of LV
1. Launch Vehicle A. Design and Verification of LV
1. Launch Vehicle B. Fullscale Flight Results
1. Launch Vehicle B. Fullscale Flight Results
1. Launch Vehicle C. Mission Performance Predictions Altitude Predictions from OpenRocket
1. Launch Vehicle C. Mission Performance Predictions
1. Launch Vehicle C. Mission Performance Predictions
1. Launch Vehicle C. Mission Performance Predictions CP and CG locations
1. Launch Vehicle D. Payload Integration
1. Launch Vehicle D. Payload Integration
1. Launch Vehicle E. Safety and Testing
2. Motor Selection A. Motor Specifications
2. Motor Selection B. Thrust to Weight Ratio
2. Motor Selection B. Thrust to Weight Ratio
2. Motor Selection C. Rail Exit Velocity
2. Motor Selection C. Rail Exit Velocity
2. Motor Selection D. Safety and Testing
3. Recovery A. Electrical Schematics
3. Recovery B. Avionics
3. Recovery C. Parachutes and Separation Charges
3. Recovery C. Parachutes and Separation Charges
3. Recovery D. Safety and Testing
4. Payload A. Design of Payload Experiment
4. Payload A. Design of Payload Experiment
4. Payload A. Design of Payload Experiment
4. Payload A. Design of Payload Experiment
4. Payload B. Science Value
4. Payload C. Safety and Testing
5. Project Plan A. Timeline
5. Project Plan B. Educational Engagement
6. Conclusion A. Progress towards Huntsville