1 / 42

Overcoming barriers to successful implementation

Overcoming barriers to successful implementation. Case Study. Pat Kennelly General Manager, Customer Service Dimpco. “Change”. The process by which the future invades our lives Toffler. Change in context. The last 50,000 years = 800 lifetimes 650 of those lifetimes spent in caves

erasto
Download Presentation

Overcoming barriers to successful implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overcoming barriers to successful implementation Case Study Pat Kennelly General Manager, Customer Service Dimpco

  2. “Change” The process by which the future invades our lives Toffler

  3. Change in context • The last 50,000 years = 800 lifetimes • 650 of those lifetimes spent in caves • Writing for the last 70 • Printing for the last 6 • Electricity for the last 2 • Computers for the last ½ “The world today is as different from the world in which I was born as that world was from Ceaser’s” Boulding

  4. First Snag • Lean and change are synonymous….. • In order to understand implementation you first need to understand 3 things: • Why • What • How

  5. Today’s agenda Theory • Context of Lean change initiatives • Why • (What) • How • Barriers / Issues • Methods • Keenan • Background • Early days • Recent developments • The future Practice

  6. MNC’s HQ dictat Competition within group Customer requirements SME (typical reasons) Improve efficiency Eliminate Waste 2nd Snag: Pitch it like this and your lean initiative will be dead before it leaves the ground. Why Lean – part one

  7. HBS Study on change programs >30% had little effect on bottom line 40% of IT projects abandoned <30% of BPR are successful Change Failures • Iceberg model1 is a useful way of thinking about the change process

  8. Technology Strategy Systems Structure Overt Management style Team-work Work Practices Participation Covert Power Trust History of change Norms / Culture Unconscious In other words – we’re talking about a journey…. 1: Source: IMI Handbook of Management Pg 330

  9. Acceptance Indifference Passive Resistance Active resistance Enthusiastic Co-operation Co-op under pressure from mgt Acceptance Passive resignation Indifference Apathy Doing only what is ordered Non learning Protests Working to rule Doing as little as possible Slowing down Personal withdrawal Committing errors Spoilage Deliberate sabotage The continuum of Resistance to Change2 2: AS Judson, Changing Behaviour in Organizations: Minimizing Resistance to Change 1991 p48

  10. 10 Leading reasons for resistance 3 • Individual predisposition towards change • Fear of unknown • Climate of mistrust • Fear of failure • Loss of Status • Peer pressure • Disrupt cultural traditions or group relationships • Personality conflicts • Lack of tact / poor timing • Non re-inforcing reward systems Is the resistance Rational or Emotional/ Specific or General Emotional implies “perception” – is personal, hard to understand and cannot be overcome with rational solutions 3: Kreitner & Kinicki. Organisational Behaviour. p671

  11. Methods to reduce resistance • Books written on the subject • Numerous “techniques” • Lewin (Unfreeze / Change / Freeze) • Lewin (Force field analysis) • Kotter (8 Steps) • Morgan (15%) • 2 Bottom lines…. • What are the organisational drivers • Organisation needs to be ready

  12. Organisational Drivers Most successful change initiatives are founded on: • Crisis • A drive for common progress (something in it for everyone) It is the second one that builds the virtuous circle of CI change

  13. Dissatisfaction with the Status Quo Clarity of the first few steps Resistance to change Vision of what some “future state” might be Readiness….. Source : Ray McEvoy….. D x V x C > R

  14. Richard Keenan & Co. Ltd Founded: 1979 Borris Co Carlow

  15. Core Purpose To make a real difference for farmers Richard Keenan & Co. Ltd Vision To become the unique world force in innovative machine based system solutions for farmers

  16. Today… • Corporate headquarters and global manufacturing base is in Borris, Co. Carlow • > €40m T/O • 85% Export • 170 people in Ireland • 70 people overseas – including Australia, US, Germany, France & UK • 15,000 customers in 40 countries Richard Keenan & Co. Ltd

  17. Largest manufacturer in Europe 2nd largest in the world A 25 year journey

  18. Early Steps – Key Drivers • BSE - 1996 • The need for a clear Vision / Strategy • Market change • Management Focus • A need for Cost Reduction and Better Product • A drive towards more Value added for Customer • Live or Die !!

  19. The Keenan System

  20. Keenan Competitiveness • Market position based on machine capability integrated with knowledge • More than simply production efficiency Initial focus was WCB – not just WCM

  21. Mechanism • Key Consultants – • John Sprouster • Enterprise Ireland • Waste reduction • Management structure and processes • Redefined the Keenan differentiation • Relationship building

  22. WCM Teams Process control Automation Flow WCB Sales process Costs Procurement Warranty Key Initial Concepts Quality

  23. Key production steps • New production line • Kan Ban System for material control • Teams for each main assembly area • People within each team responsible for • Health & Safety • Kan Ban • Right First Time / ISO • Housekeeping • Consumables

  24. Key steps (cont’d) • KPI’s (Key Performance Indicators) • Weekly Production Targets • Accident Reporting / Risk Assessment • Right First Time Reporting • Suggestion Scheme • Absenteeism

  25. Tangible results (early wins) • Snapshot of an interim (1999) report • 19 separate “metrics” • Benefits clear from an early stage

  26. More recent developments Brought to focus by some key strategic drivers • Competitiveness within Ireland • Capacity constraints in the factory Make in house: Material Cost: €16.14 Outsource (E.Europe)Total Cost: €19 including delivery….

  27. Production Strategy • Increase competitiveness • Outsource lower value added activity • Keep key competencies in house • Move towards “high value add” production • Improve layout • Increase Capital investment • Modify machine design to improve efficiency • Build further innovation capability

  28. Capability Development Keenan Engineering • Dedicated engineering building • €0.5 million investment • Foundation for future growth • 4 Engineers • 2 Draftsmen • 3 Technicians • (66% dept. degree qualified) • 4 staff in Production and Engineering recently became lean green belts

  29. Example 1 • Paddles • New cell designed and built (group input) • Part specific tooling designed and made in house • New materials allowed design change with lower cost & weight, but higher strength • Capital team built cell, tested process and trained teams • Time to manufacture reduced by >50% • Part cannot be bought in cheaper than can be made in house

  30. Example 2 • Chassis Cell • Most of the product complexity is in the chassis area • More than 1000 permutations of chassis, wheel, tyre… • Historically built in 2 plants, with lots of material movement • Not suitable for outsourcing

  31. Chassis Cell - results • New cell in a single location • Part specific tooling designed and made in house (reversible jigs & draggers) • Increased capacity • Staff count reduced from 9 to 7 (-22%) • No movement of material

  32. New cell during construction

  33. Common Themes • Change credibility built up during late 90’s • Allowed more aggressive changes in the last couple of years • In house skill with jigs and tooling • Combined benefits • Easier working conditions • Better productivity • Redeployment of staff

  34. Results Hours to manufacture reduced by 66% since 1997

  35. The Future • Develop the Keenan Manufacturing System • Single assembly plant • Mixed model value stream • Double production capacity (30 min takt time) • Drivers • Current facility is capacity constrained • Future EPA requirements needs state of art painting • Current 2 plant layout not optimum efficiency

  36. Single Assembly Plant Layout –

  37. Summary • Keenan continue to thrive and prosper in a global business – based in an economy that has been written off from a manufacturing perspective • That they do so, is not just testimony to the product offering, but is a measure of, and just reward for the skill and innovation necessary to keep the product competitive • It can be done….

  38. Better Farming - Better Food

More Related