This session at the APTA Annual Meeting on 10/03/2012 provides information on the MAP-21 funding levels, environmental provisions, metropolitan planning, eligible new starts projects, small starts projects, and core capacity. It also discusses the project development process and expedited project delivery under MAP-21.

ericbarton
Download Presentation

MAP-21 Funding Levels

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Investment ProgramListening SessionPresented at APTA Annual Meeting -- 10/03/2012RailVolution 2012 -- 10/14/2012

  2. MAP-21 Funding Levels • Section 5309 program funding level $1.9 billion • No specified funding levels for New Starts, Small Starts or Core Capacity

  3. MAP-21 Environmental Provisions • Accelerate project delivery and promote innovation while enhancing safety and protecting the environment • Streamline transit and multi-modal project delivery • Continue 2012 rulemaking to add additional categorical exclusions for transit projects

  4. MAP-21 Metropolitan Planning • Transit representation on MPO boards in regions of 200,000 population or more • Performance measures and targets in Long Range Plans and Transportation Improvement Programs (TIPs) • Flexible funding from Title 23 - option for transit

  5. MAP-21 Eligible New Starts Projects • Total New Starts funding sought is >$75M and/or project cost ≥ $250M • New fixed guideway minimum operable segment or extension to existing fixed guideway system • Fixed guideway BRT: • Majority operates in separate right-of-way • Represents substantial investment in a single route in a defined corridor • Includes defined stations, traffic signal priority for transit, and short headway bidirectional services for substantial part of weekdays and weekend days

  6. New Starts Project Development Process Under SAFETEA-LU Alternatives Analysis Preliminary Engineering Final Design Full Funding Grant Agreement • Develop and review alternatives • Select locally preferred alternative (LPA) • Adopt LPA into fiscally constrained long range transportation plan • Complete environmental review process • Gain commitments of at least 50% of non-New Starts funding • Gain commitments of all non-New Starts funding • Complete sufficient engineering and design • Construction Under MAP-21 • Gain commitments of all non-New Starts funding • Complete sufficient engineering and design • Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan • Construction Engineering Full Funding Grant Agreement Project Development Legend = FTA approval = FTA evaluation, rating, and approval

  7. MAP-21 Eligible Small Starts Projects • Total cost <$250 million and Small Starts share <$75 million • New fixed guideway systems and extensions • Fixed guideway BRT • Corridor-based BRT that represents a substantial investment in a defined corridor, with features including: • Defined stations • Traffic signal priority for transit • Short headway bi-directional services for a substantial part of weekdays and weekend days

  8. Small Starts Project Development Process Under SAFETEA-LU Alternatives Analysis Project Development Project Construction Grant Agreement • Develop and select locally preferred alternative (LPA) • Adopt LPA into fiscally constrained long range transportation plan • Complete environmental review process • Gain commitments of all non-5309 funding • Complete sufficient engineering and design • Construction Under MAP-21 • Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into fiscally constrained long range transportation plan • Gain commitments of all non-5309 funding • Complete sufficient engineering and design • Construction Project Development Expedited Grant Agreement Legend = FTA approval = FTA evaluation, rating, and approval

  9. MAP-21 Core Capacity Eligibility • Substantial corridor-based investment in existing fixed guideway system • Project must: • Be located in a corridor that is at or over capacity or will be in five years • Increase capacity by 10% • “not include project elements designed to maintain a state of good repair”

  10. MAP-21 Core Capacity • Definition includes: • Acquisition of real property and ROW • Double tracking • Signalization improvements • Electrification • Expanding system platforms • Acquisition of rolling stock for increasing capacity • Infill stations • Specifically says “does not include elements to improve general station facilities or parking or acquisition of rolling stock alone.”

  11. MAP-21 Core Capacity Process • Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan Engineering Full Funding Grant Agreement Project Development Legend = FTA approval = FTA evaluation, rating, and approval

  12. MAP-21 Evaluation and Rating Criteria

  13. MAP-21 Pilot Program for Expedited Project Delivery • Demonstrate whether innovative project development & delivery methods or innovative financing can expedite project delivery • No separate funding pot • Eligible projects are new fixed guideways or core capacity projects seeking Section 5309 funds and not yet under an FFGA • 3 projects will be selected • At least 1 shall be seeking > $100M in 5309 funding • At least 1 shall be seeking < $100M in 5309 funding

  14. MAP-21 TOD Pilot Program • Section 20005(b) of MAP-21 • $10 million annually to assist in financing comprehensive planning associated with Section 5309 projects • No funding available under a continuing resolution. Must await full year FY13 appropriation, as determined by Congress.

  15. Next Steps • Interim guidance • Regulations • Federal Register notices seeking applicants for pilot programs