Karangasem Banjar Aas Deep Well Water Project. Deep well (Bore) for Br Aas Community Bale for local water distribution. Project Description & Scope. Description;
E N D
Karangasem Banjar Aas Deep Well Water Project Deep well (Bore) for Br Aas Community Bale for local water distribution
Project Description & Scope Description; • The Br Aas deep well project focuses specifically on the drilling of a well at the Banjar and installation of a well pump and tank to provide a reliable source of clean water to the (~ 200) families of the Aas community – Part 1 (this project) • The overall Aas water project is to install a piped distribution network up the mountain to those of the community most in need. – Part 2 Project Scope • Drill a well nominally 40m deep in hard rock. • Install a submersible pump (2m3/hr) which will use power from the Banjar Hall • Install a 3300Lt receiving tank with outlet to provide water at the community centre.
Project Funding & Team Funding; • RC Ignacio – California - Cash via the Sunset foundation • $US 6000.00 Project Budget • Rp 68.182.100 Team • Sunset; Allan Starr • RC Colorado Springs; Rich Foss • Other Members: Ping – from Culik
Financial Budget & Current Status Budget Comment - may be under pressure as the power connection cost is unknown at this point
Project Status Snapshot • Project Summary • Beneficiary: Br Aas • Funding: Rotary Club Ignacio, CA Found. • Funding Obtained: Rp68.182.100 • Estimated Cost: ~ Rp68.182.100 • Disbursed to Date: Rp60.000.000 • Planned Schedule: Commence April, complete July • Actual and Expected Schedule: Complete Nov 2014 • Special skills or needs: primarily drilling contractor • Project Scope and Issues • Scope: Bore a deep well and install a submersible pump and receiving tank at the Banjar to supply water to the local community • Issues: • Securing a competent Boring contractor with local experience and able to guarantee water – no water no money. Fixed price contract • Ensuring cash flow for the contractor • Power supply for the pump • Pump selection and installation Current Status & Look Ahead Planned Key Milestones Select contractor March 14 Kepala Dusun & Adat agreement April complete Bore Contractor establishment April complete Bore capacity test Plan June Act Aug complete Sponsor interim report & Visit 10/14 complete Pump & tank installation Nov 14 Final report and Follow-up visit Dec 14