1 / 8

Karangasem Banjar Aas Deep Well Water Project

Karangasem Banjar Aas Deep Well Water Project. Deep well (Bore) for Br Aas Community Bale for local water distribution. Project Description & Scope. Description;

Download Presentation

Karangasem Banjar Aas Deep Well Water Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Karangasem Banjar Aas Deep Well Water Project Deep well (Bore) for Br Aas Community Bale for local water distribution

  2. Project Description & Scope Description; • The Br Aas deep well project focuses specifically on the drilling of a well at the Banjar and installation of a well pump and tank to provide a reliable source of clean water to the (~ 200) families of the Aas community – Part 1 (this project) • The overall Aas water project is to install a piped distribution network up the mountain to those of the community most in need. – Part 2 Project Scope • Drill a well nominally 40m deep in hard rock. • Install a submersible pump (2m3/hr) which will use power from the Banjar Hall • Install a 3300Lt receiving tank with outlet to provide water at the community centre.

  3. Project Funding & Team Funding; • RC Ignacio – California - Cash via the Sunset foundation • $US 6000.00 Project Budget • Rp 68.182.100 Team • Sunset; Allan Starr • RC Colorado Springs; Rich Foss • Other Members: Ping – from Culik

  4. Financial Budget & Current Status Budget Comment - may be under pressure as the power connection cost is unknown at this point

  5. Project Status Snapshot • Project Summary • Beneficiary: Br Aas • Funding: Rotary Club Ignacio, CA Found. • Funding Obtained: Rp68.182.100 • Estimated Cost: ~ Rp68.182.100 • Disbursed to Date: Rp60.000.000 • Planned Schedule: Commence April, complete July • Actual and Expected Schedule: Complete Nov 2014 • Special skills or needs: primarily drilling contractor • Project Scope and Issues • Scope: Bore a deep well and install a submersible pump and receiving tank at the Banjar to supply water to the local community • Issues: • Securing a competent Boring contractor with local experience and able to guarantee water – no water no money. Fixed price contract • Ensuring cash flow for the contractor • Power supply for the pump • Pump selection and installation Current Status & Look Ahead Planned Key Milestones Select contractor March 14 Kepala Dusun & Adat agreement April complete Bore Contractor establishment April complete Bore capacity test Plan June Act Aug complete Sponsor interim report & Visit 10/14 complete Pump & tank installation Nov 14 Final report and Follow-up visit Dec 14

  6. Br Aas - Why

  7. The Bore is Successful

  8. Project Stewardship

More Related