1 / 22

Typical steps in municipal wastewater treatment

Typical steps in municipal wastewater treatment. Archimedes screws for initial wastewater pumping. Module for flow repartition (between dry-weather and wet-weather treatment lines). Parshall flume for flow-rate measurement (at the outlet of the plant). bar screen separation.

erik
Download Presentation

Typical steps in municipal wastewater treatment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Typical steps in municipal wastewater treatment

  2. Archimedes screws for initial wastewater pumping

  3. Module for flow repartition (between dry-weather and wet-weather treatment lines)

  4. Parshall flume for flow-rate measurement (at the outlet of the plant)

  5. bar screen separation

  6. Grit and grease removal

  7. counter-current washing and extraction of the grits

  8. Terminal settling velocity vs DECANTATION Gravity – Archimedes buoyancy

  9. Terminal settling velocity vs DECANTATION Gravity – Archimedes buoyancy We define a = 1.096 b = 13.86

  10. vs vs = vs d

  11. Boycott effect

  12. vs can now be reduced to

  13. LAMELLA SETTLING TANKS: Shortening the settling distance Pipe bundles also used

  14. Actiflo process (OTV - Krüger) coagulation, flocculation, settling assisted by 125µm microsand injection, lamellar gravity separation residence time lower than 15 min

More Related