1 / 23

Time Series for Central West Grand Terre Island of the Lafourche Shoreline 1984 - 2007

Time Series for Central West Grand Terre Island of the Lafourche Shoreline 1984 - 2007. Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University of New Orleans. Karen A Westphal.

errin
Download Presentation

Time Series for Central West Grand Terre Island of the Lafourche Shoreline 1984 - 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Series forCentralWest Grand Terre Islandof the Lafourche Shoreline1984 - 2007 Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University of New Orleans Karen A Westphal

  2. The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison.

  3. Location of Grand Terre Island, Louisiana West Grand Terre Island is in BICM region “Lafourche Delta” and BICM segment 45 “Grand Terre Island”

  4. 1984 All photos registered to this point 29º17’02"/89º54’04” - View to north July 9, 1984

  5. 1988 post-Hurricane Gilbert 29º17’02"/89º54’04” - View to north October 12, 1988

  6. 1990 29º17’02"/89º54’04” - View to north June 25, 1990

  7. 1992 29º17’02"/89º54’04” - View to north July 9, 1992

  8. 1993 29º17’02"/89º54’04” - View to north June 16, 1993

  9. 1994 29º17’02"/89º54’04” - View to north July 26, 1994

  10. 1996 29º17’02"/89º54’04” - View to north July 17, 1996

  11. 1999 29º17’02"/89º54’04” - View to north August 27, 1999

  12. 2001 29º17’02"/89º54’04” - View to north June 14, 2001

  13. 2002 post-Tropical Storm Isodore 29º17’02"/89º54’04” - View to north October 1, 2002

  14. 2002 post-Hurricane Lili 29º17’02"/89º54’04” - View to north October 5, 2002

  15. 2004 pre-Hurricane Ivan 29º17’02"/89º54’04” - View to north September 13, 2004

  16. 2004 post-Hurricane Ivan 29º17’02"/89º54’04” - View to north September 18, 2004

  17. 2005 post-Hurricane Rita 29º17’02"/89º54’04” - View to north September 30, 2005

  18. February 2007 29º17’02"/89º54’04” - View to north February 26, 2007

  19. April 2007 29º17’02"/89º54’04” - View to north April 20, 2007

  20. 10 Years • 1984 1994

  21. 13 Years 1994 2007

  22. 23 Years 1984 2007

  23. Relevant Coastal Restoration Projects • Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island. State Project Number:BA-28
Project Priority List (PPL):07
Federal Sponsor: National Marine Fisheries Service (NMFS)
Project Type:Vegetation Planting
Construction Completion Date:2001 Description: The goal of this project is to stabilize dredged material sites on West Grand Terre Island. This objective was achieved through vegetation plantings and by purchasing grazing rights on the island for the life of the project (20 years). • East/West Grand Terre Islands Restoration. State Project Number:BA-30
Project Priority List (PPL):09
Federal Sponsor:National Marine Fisheries Service (NMFS)
Project Types:Barrier Island, Marsh Creation
Construction Completion Date:Pending Description: The goal of this project is to stabilize and benefit 1,575 acres of barrier island habitat and extend the island's life expectancy. Dredged material will be used to create dune and marsh habitat on East Grand Terre Island. http://dnr.louisiana.gov/crm/coastres/projectlist.asp