160 likes | 288 Views
Use stations looking at day side Change normalization factor dBz /|dB| -> dBz /B 0 for observed data, B 0 =(Bx ^ 2+By^2+Bz^2)^0.5 for estimated data, B 0 =5nT. For both method, c heck 5 good correlation events (coefficient > 0.5 for either dBz or normalized dBz )
E N D
Use stations looking at day side • Change normalization factor dBz/|dB| -> dBz/B0 for observed data, B0=(Bx^2+By^2+Bz^2)^0.5 for estimated data, B0=5nT
For both method, check 5 good correlation events (coefficient > 0.5 for either dBzor normalized dBz) and see how it changes
all stations day side stations Estimated data is missing Not enough station available
all stations day side stations
all stations day side stations
all stations day side stations
all stations day side stations
all stations day side stations
all stations day side stations
norm by |dB| norm by B0
norm by |dB| norm by B0
norm by |dB| norm by B0
norm by |dB| norm by B0
norm by |dB| norm by B0
norm by |dB| norm by B0
norm by |dB| norm by B0