An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCGT MeetingLaser & Mirror 12 December, 2011

  2. Laser • Ordered fiber amplifiers made by Nufern will be shipped on 16th December. • After the amplifiers arrive at Tokyo, we will start the evaluation of their performance. • A person of a company that may assemble the system will visit me on 15th December in order to discuss the laser system for LCGT.

  3. Mirror • Polish of MC mirrors have been done. • Hirose-san and Mio are visiting CSIRO to discuss the polish and coating of BS and arm mirrors of iLCGT. • Hirose-san have inquired the possibility to fabricate mirrors for a PR cavity and an SE cavity. • Ohashi-san, Hirose-san and Mio visited Canon in order to discuss the possibility to polish the mirrors. Canon is now much interested in joining this project. • Small mirror samples (1-inch) have been coated by Showa and will be done by Tokai-Kogaku; I asked to make the coating of 99.999% reflectance.

  4. Sapphire • We have started the procedure for purchasing c-axis crystals of 22-cm diameter and 15-cm thickness . • We have obtained sapphire samples from SIC; they have been sent to a Showa in order to polish and AR –coat; they will be delivered to us in the second week , coming January. • Two persons will visit us for joining the absorption measurements that will be done just after the next f2f meeting. • Small samples of sapphire (1-inchi) have been polished and are now being coated to have the reflectance of 99.99%.