Concerns and Problems with Rainbow Beach • Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. • Visitors are being lost to other venues. • The condition of the bathhouse is substandard. • Without shade, the oversized concrete pool deck is oppressive in the summer heat. • Pool mechanical system is antiquated and is past its life expectancy. • The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks. • Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes. • Maintaining chemical balance for this pool is difficult. • It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell. City of Vincennes – Aquatic Facility Study
Recommendations 1. Slides and / or Diving Boards 2. Play Apparatus / Structure for all ages 3. Zero Depth Entry 4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool 5. Upgraded Bathhouse 6. Improved Concessions 7. ADA Accessibility 8. Variety of Experiences – Water Basketball, Water Volleyball, Etc. 9. Shade Structures and Lounge Seating 10. Sound System and Wi-Fi 11. Planned Activities and Programs City of Vincennes – Aquatic Facility Study City of Vincennes – Aquatic Facility Study City of Vincennes – Aquatic Facility Study
Pool Amenities City of Vincennes – Aquatic Facility Study
Slides City of Vincennes – Aquatic Facility Study
Zero Depth Entry City of Vincennes – Aquatic Facility Study
Shade Structures City of Vincennes – Aquatic Facility Study
Play Apparatus City of Vincennes – Aquatic Facility Study
Spray Parks City of Vincennes – Aquatic Facility Study
Recreation/Competition Combination City of Vincennes – Aquatic Facility Study
Bathhouse, Locker Facilities and Party Facilities City of Vincennes – Aquatic Facility Study
Options for Rainbow Beach City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility • Description and Cost • Existing Recreation Pool and Bathhouse to Remain…………………….....................…....... • Remove existing Wadding Pool and Deck………………………………………………………….…. • Create New Splash Park………………………..…………………………………………………………… • Provide Associated Site Improvements…………………….…………………………………….….... • Shade Structures, Pavement, Fencing, Etc. • Contractor General Conditions/Overhead & Profit…………………………………………..……….. • Construction Range of Magnitude Budget………………..…………………………….….…….. • Add new deck around the existing pool…………………………………………………………….……. • 0 • 10,000 • 140,000 • 85,000 • 22,000 • 257,000 • ????? • $ • $ • $ • $ • $ • $ City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility • Description and Cost • Minor Renovations to Existing Bathhouse.……………….…......................................... • Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………............. • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, • New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures……………….…………….………………………………………………..…......… • Provide New Water Slide…………………………………………………………………………....... • New Water Features/Play Apparatus……………………….………………………………...….. • Contractor General Conditions/Overhead & Profit.………………………………………..…. • Construction Range of Magnitude Budget……….………………………………….........… • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,800,000 • 810,000 • 175,000 • 165,000 • 305,000 • 3,355,000 • -$300,000 • -$3,480,000 City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility • Description and Cost • Minor Renovations to Existing Bathhouse………………….…..................................... • Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………......... • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, • New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures……………………………………………………………………………………... • Provide New Water Slide…………………………………………………………………………... • New Water Features/Play Apparatus.……………………………………………………….... • Add Spray Park and Associated Site Improvements………………………………………. • Contractor General Conditions/Overhead & Profit…………………………………..…… • Construction Range of Magnitude Budget………………………………………..…….… • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,800,000 • 810,000 • 175,000 • 165,000 • 160,000 • 321,000 • 3,531,000 • -$300,000 • -$3,656,000 City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…..................... • Create New Pool………………………………………………………………....……….......... • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..………………... • Provide New Water Slide………………………………………………………..................... • New Water Features/Play Apparatus……………….…………………….………………... • Contractor General Conditions/Overhead & Profit………………….………............ • Construction Range of Magnitude Budget…………………………….................... • 100,000 • 1,250,000 • 740,000 • 175,000 • 165,000 • 243,000 • 2,673,000 • $ • $ • $ • $ • $ • $ • $ • -$300,000 • -$2,798,000 City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…..................... • Create New Pool………………………………………………………………....……………… • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..……………….. • Provide New Water Slide………………………………………………………................... • New Water Features/Play Apparatus…..………………………………….……………….. • Add Spray Park and Associated Site Improvements…………………………………… • Contractor General Conditions/Overhead & Profit………………….………………… • Construction Range of Magnitude Budget…………………………….................... • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,250,000 • 740,000 • 175,000 • 165,000 • 160,000 • 259,000 • 2,849,000 • -$300,000 • -$2,974,000 City of Vincennes – Aquatic Facility Study
Option C.2: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.2: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…............ • Create New Pool………………………………………………………………....……… • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..……….. • Provide New Water Slide………………………………………………………........... • New Water Features/Play Apparatus…..………………………………….……….. • Add Spray Park and Associated Site Improvements………………………….. • Contractor General Conditions/Overhead & Profit………………….……….. • Construction Range of Magnitude Budget…………………………….......... • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 2,300,000 • 810,000 • 175,000 • 165,000 • 160,000 • 371,000 • 4,081,000 • -$300,000 • -$4,206,000 City of Vincennes – Aquatic Facility Study
Option C.3: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.3: Construction of a replacement facility • Description and Cost • Create New Pool………………………………………………………………....………… • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..………….. • Provide New Water Slide………………………………………………………............. • New Water Features/Play Apparatus………………..……………………………….. • Add Spray Park and Associated Site Improvements…………………………….. • Add New Bathhouse with Concessions………………………………………………. • Contractor General Conditions/Overhead & Profit………………….………….. • Construction Range of Magnitude Budget……………………………............. • 2,300,000 • 810,000 • 175,000 • 165,000 • 160,000 • 625,000 • 423,000 • 4,658,000 • $ • $ • $ • $ • $ • $ • $ • $ • -$300,000 • -$4,783,000 City of Vincennes – Aquatic Facility Study
Cost Comparison City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study