An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical cooperation challenges National planning for CNS/ATM systems for India

  2. ICAO OVERALL PLANNING PROCESS STRUCTURE GLOBAL AIR NAVIGATION PLAN FOR CNS/ATM GUIDANCE REGIONAL PLANNING PROCESS (7 Regions) NAT SPG EANPG NAM-PG MIDANPIRG GREPECAS APANPIRG APIRG NATIONAL PLANS

  3. Technical cooperation project ICAO and India To structure a national plan for CNS/ATM systems

  4. Mechanism Management Core group of national experts ICAO expert

  5. Process • Established a continuous ongoing consultations within the core group and with the management • Adopted a systems approach providing end to end analysis encompassing critical issues

  6. Critical issues • Technical audit • Air traffic forecasts • Airspace users requirements • Functional requirements

  7. Critical issues (continued) • Cost benefit analysis • Sensitivity analysis • Implementation timelines • Harmonization

  8. Interface with CNS/ATM systems partners • Military • Airspace users • Industry

  9. Deliverables • CNS/ATM systems planning document • High level presentation

  10. Extension to worldwide application • Request from States for similar assistance • In response a model national plan for CNS/ATM systems has been prepared

  11. Model national plan for CNS/ATM systems • Serves as guidance material for the States • Comprises of comprehensive check lists, standard templates,decision trees and implementation tables

  12. Model national plan (continued) • Covers cost/benefit studies including sensitivity analysis • Assist in harmonization of national plan with regional plan

  13. Workshops on model national plan • Designed workshops with focus on <<hands on>> experience • Organized during 1997-98: 3 workshops for the States of MID region and 4 workshops for States of CAR/SAM region

  14. Workshops on model national plan (continued) • Planned workshops during June-Dec 1998: • six workshops covering all the States of Africa • one workshop for eastern European States

  15. Conclusion • ICAO has established a technical cooperation project in planning and implementation of CNS/ATM systems • States requiring assistance may avail this opportunity