1 / 8

Technical Co-operation Challenges

Technical Co-operation Challenges. Why ? Capabilities of existing Brazilian Institutions. Technical co-operation from Brazil ?. Experience in training foreign Aviation personnel - since 1980 Participants nominated to almost every Panel, Committee, Study Group established by ICAO

Download Presentation

Technical Co-operation Challenges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Co-operation Challenges • Why ? • Capabilities of existing Brazilian Institutions

  2. Technical co-operation from Brazil ? • Experience in training foreign Aviation personnel - since 1980 • Participants nominated to almost every Panel, Committee, Study Group established by ICAO • TRAINAIR Member • Most air traffic flows in the Region affect Brazilian airspace

  3. Institutes ready for technical co-operation • Civil Aviation Institute - IAC • Institute of Aeronautical Cartography - ICA • Institute of Air Navigation Services - IPV

  4. Technical co-operation fields (Group Training) • GNSS operations • CNS/ATM concepts • CNS/ATM senior management • Procedures of Air Navigation (OPS & RAC)

  5. Technical Co-operation (Assistance of Experts) • WGS-84 • Aeronautical Charting • Procedure construction (PANS-OPS) • Training development (TRAINAIR method.) • CNS/ATM master planning

  6. CNS/ATM Challenges • Aeronautical jobs survey • Technology insertion - Impacts on staffing, for example: • implementation of RVSM = increase of Air Traffic Controllers (by 60 % ? )

  7. ATM Challenges • Case of Air Traffic Flow Management • - high degree of automation • - global aspects • - new function for Air Traffic Controllers • - international co-operation is a must

  8. Technical Co-operation • Needs • Good deal • Mechanisms • Who pays for it

More Related