180 likes | 340 Views
CEZ WIND FARMS IN ROMANIA FANTANELE, COGEALAC ADRIAN BOROTEA CORPORATE AFFAIRS DIRECTOR CEZ ROMANIA. COMMUNICATION FROM THE eu COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011 RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS.
E N D
CEZ WIND FARMS IN ROMANIAFANTANELE, COGEALACADRIAN BOROTEACORPORATE AFFAIRS DIRECTORCEZ ROMANIA
COMMUNICATION FROM THE eu COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS
COMMUNICATION FROM THE eu COMMISSION TO PARLIAMENT AND COUNCIL (2) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS
RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETSsupporting schemes
cEz group is an international utility with a stable position in domestic market and a growing poRtfolio in cee
CEZ WINDFARM PROJECT IN ROMANIA WILL BE THE LARGEST ON-SHORE IN EUROPE
WIND TURBINE PARTS WERE DELIVERED FROM DIFFERENT PARTS OF THE WORLD VIA MIDIA HARBOR
120 TURBINES EACH OF 2.5 MW WERE INSTALLED AT FANTANELE BY THE END OF 2010
THE MAIN TRANSFORMER STATION AT TARIVERDE WAS THE FASTEST TO BE BUILT IN ROMANIA
CEZ GROUP INVESTMENT BRINGS MANY BENEFITS ALSO TO LOCAL COMMUNITIES WHERE THE WIND FARM WILL OPERATE