210 likes | 360 Views
P11228 Week 9: Detailed Design Review. Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss. Agenda . Project Introduction Updated Workload Distribution Updated Engineering Specifications Finalized Designs System Packaging Steering Wheel Manual Back-up System
E N D
P11228Week 9: Detailed Design Review Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss
Agenda • Project Introduction • Updated Workload Distribution • Updated Engineering Specifications • Finalized Designs • System Packaging • Steering Wheel • Manual Back-up System • Electronics and Control System • Feasibility Studies • Project Testing Plan • Updated System Risks
Workload Distribution See Progress Tracking Excel File for in-depth workload distribution and tracking
System Risks & BOM • https://edge.rit.edu/content/P11228/public/Risk%20Assessment • See Excel document for BOM