1 / 15

WATER INJECTION/FLOODING TRAINING COURSE MODULE

WATER INJECTION/FLOODING TRAINING COURSE MODULE. PRESENTED MELCHIZEDEK ENGINEERING LIMITED MEL CONSULTING . What you will learn. Water Injection Process Water Treatment for Injection Water Treatment for Re-injection Meeting Water Quality Specification Produced Water Treatment

ethel
Download Presentation

WATER INJECTION/FLOODING TRAINING COURSE MODULE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WATER INJECTION/FLOODING TRAINING COURSE MODULE PRESENTED MELCHIZEDEK ENGINEERING LIMITED MEL CONSULTING

  2. What you will learn • Water Injection Process • Water Treatment for Injection • Water Treatment for Re-injection • Meeting Water Quality Specification • Produced Water Treatment • Produced Water Controls • Enhanced Oil Recovery • OSHA, HSE CASE

  3. Water Flooding Training Program • Learn Meeting water quality specifications • Learn Injection/Re-injection Essential • Learn Protecting the Permeability of the reservoir. • Learn Developing the water drive required for enhanced oil Recovery • Learn also Subsequently the increased production and protection of our environment. • Learn the Safety Issues and environmental Issues

  4. Who Should Attend? • All personnel who are involved in the operation of this equipment. • New hire engineers. • Production foreman and supervisors • Safety management personnel. • Individuals needing a Working Knowledge of a Dehydration Systems in a Gas Plant, will find this class extremely valuable and very interesting. • Those who already have some experience in this area will be provided with an enlightening supplement to their knowledge, in regards to Water Flooding Issues

  5. Course Outline • Principles and Operations of Water Flooding • Water Treatment • Water content of natural gas • Purpose of Water Flooding • Water Injection Process • Water Treatment for Injection • Water Treatment for Re-injection • Meeting Water Quality Specification • Produced Water Treatment • Produced Water Controls • Enhanced Oil Recovery • OSHA, HSE CASE

  6. Course Objective • Increased employee effectiveness. • Decreased cost of operations. • Substantial financial benefits from the program can also be realized. • The Effectively Methodology of Water Flooding Injection & Re-Injection • Reports from our customers have indicated a cost saving of up to 50% due the new awareness of proper startup procedures, operating procedures, maintenance programs and safety awareness.

  7. System Maintenance • Water Flooding Maintenance system • Operating the flooding system • Liquid levels for Injection • Liquid levels for re-injection • Flow Rates for Permeability of the Reservoir • Effect of variables outside their recommended ranges

  8. Continue • New unit startup in Water Injection • Shutdown for short Maintenance • Shutdown for Corrosion Controls

  9. System Maintenance • Preventative maintenance / operation • Communication Swifter Measures • Record keeping • Mechanical Maintenance • Corrosion Control

  10. Troubleshooting • Knowing when there is a Water Flooding problem • Logic to troubleshooting • Re-injection Mechanism • Injection Mechanism • Excess operating cost

  11. Maintaining Variable Capacity Range • Process requirements • Treated water capacity 135,000bpd • Suspended solids 98% removal <=2micron • Dissolved oxygen <=10 ppb • Injection pressure 126 Barg

  12. Water Flooding Units Designs formulation of a typical Water Flooding Unit Injection & Re-injection Treatment Plant.

  13. Major Equipment Technique for Using • Source water solid liquid Hydro cyclones • Temporary retention pond • Surge tank • Water injection/source water manifolds at the CPF • Waterflood fine filters package • All interconnecting piping • Waterflood booster pumps • All interfaces with existing power and control cabling • Waterflood injection pumps • Chemical injection systems • Hydrocarbon vent/flare system • Switchgear/control building

  14. OUR OBJECTIVES IN PRODUCTION TECHNIQUES • Whether you require overall project management for complete integrated process systems or offshore authority certification for production platforms and floating production units, we have the engineering, internal manufacturing JV and project management expertise to meet your needs. And, our OEM Partners global network of sales offices, engineering centers and quality controlled manufacturing facilities ensures close contact with our us in regards to servicing Multination Oil & Gas Companies, and expedited delivery times and competitive pricing. • We also offer treatability testing at our state-of-the-art laboratories and with our on-site pilot units. With these services, you’re assured the right equipment for the job, designed and sized to meet your specific application.

  15. Presented By ENGINEERING CONSULTING To TOTALFINAELF

More Related