APEX Schedule April 1, 2014

APEX Schedule April 1, 2014. Injection. Injection. Store. Injection. Store. Injection. Injection. DA measurement with 2.5GeV working point Montague. Momentum Aperture measurement Luo. ATS preparation GRD, Simon, Bai, Al. Coupling matrix measurement Tepikian. Elens commissioning

aneko
Download Presentation

APEX Schedule April 1, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX Schedule April 1, 2014 Injection Injection Store Injection Store Injection Injection DA measurement with 2.5GeV working point Montague Momentum Aperture measurement Luo ATS preparation GRD, Simon, Bai, Al Coupling matrix measurement Tepikian Elens commissioning Gu, Fischer, Luo, Simon DX Aperture Scan Luo, Tepikian, Al, Bai AC dipole setup Bai Back2Physics 8:00am 2:00pm 4:30pm 5:30pm 8:00pm 10:00am 10:00pm 11:00pm 12:00pm

  2. APEX Overview Back to Physics collision right after midnight • Elens commissioning • Gu, Fischer, White • Luo, etc • Confirmed e beam alignment with Au beam • First Telescope Optics Squeeze for RHIC(TOR) test • GRD, Luo, White, Shen, Bai • Achieved 0.6m beta* at both IPs in Blue with good lifetime and small global beta-beat • Beam was re-bucketed and non-cooled • First Telescope Optics Squeeze for RHIC(TOR) test • GRD, Luo, White, Shen, Bai • Achieved 0.5m beta* with good lifetime after chromaticity corrections Off-momentum aperture scan Luo, GRD, Liu etc DA with 2.5GeV working point Injection, Montag No data due to main power supply QLI IP transfer map: Tepikian V ac dipole setup: Bai DX aperture scan Luo, Marusic, Bai, Tepikian, White

  3. Elens: Gu, Fischer, White, Luo, etc Measured Orbit and Tune Shift

  4. Elens: Gu, Fischer, White, Luo, etc Summary

  5. Momentum Aperture MeasurementAl, cait, chuyu, grd, Mei, Michiko, Yun

  6. First Telescope Optics Squeeze for RHIC testGRD, Marusic, Shen, White, Luo, Tepikian, Bai IP6: Beta*x,y=0.57m,0.57m IP8: Beta*x,y=0.62m,0.61m IP6: Beta*x,y=0.55m,0.43m IP8: Beta*x,y=0.54m,0.53m Au14-ats::beta60 Au14-ats::beta50 DX aperture Scan at Injection

  7. First Telescope Optics Squeeze for RHIC testGRD, Marusic, Shen, White, Luo, Tepikian, Bai Au14-ats::beta60

  8. First Telescope Optics Squeeze for RHIC testGRD, Marusic, Shen, White, Luo, Tepikian, Bai

  9. First Telescope Optics Squeeze for RHIC testGRD, Marusic, Shen, White, Luo, Tepikian, Bai Poor data quality due to lower bunch intensity Au14-ats::beta50

  10. DX Aperture ScanMarusic, Luo, Tepikian, Bai Summary & Plan 1. Full sets of data taken at injection Measurement done at injection after a dipole QLI 2. Detailed data analysis is under way likely beam began to loss at 1.6mrad ( half of maximum ) 3. May repeat this experiment once → one confirmation at injection → one confirmation at store