Manchester's contribution to CALICE project; SCT construction, thermal design, testing, assembly of silicon modules, detector testing, production database, and QA processes discussed. Addressing thermal issues, module assembly challenges, detector characteristics, and heat flow considerations using FLEXPDE package. Manchester's experience in detector building outlined.

ethelm
Download Presentation

CALICE: Thermal, Mechanical and Assembly issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALICE: Thermal, Mechanical and Assembly issues UCL Wednesday 10th November 2004 What Manchester could contribute

  2. Manchester and Silicon • Part of ATLAS SCT construction • Thermal design: simulation and testing • Assembly of 650 silicon modules • Survey, I-V, readout tests • Production database and QA

  3. ‘Challenges’ of CALICE build • Testing detectors before assembly • Silicon characteristics • Identify and remember dead cells (if simulations show we are able to use “2nd quality Silicon”) • Do this in automatic or semiautomatic system (for prototype and for the full detector)

  4. Challenges (contd) • Mount detectors on substrate • Check for flatness and mechanical tolerances • Know where the detectors are on the PCB • Know where the PCB is inside the module. Location pins? • Check connectors all made properly • Check the Tungsten • Metal sheets: Flatness? Thickness?Exact size • Macro assemble of complete module

  5. Thermal Issues • Heat generated by electronics • What about MAPS? How many watts? • Can we put the preamps on the detector? Even if we can’t, the electronics cooling needs doing properly. • Heat flows away – thermal conductivity in Silicon, Tungsten and Carbon Fibre (non-isotropic). Cooling blocks/cooling pipes • Studies using FLEXPDE package (we have experience and licence)

  6. Heat flow through Tungsten and Carbon Fibre Studies by Ian Duerdoth(previously shown). Could be continued

  7. Heat Flow This is one corner.

  8. Temperature Isotherms. Various possible scenariosNow we know the technology – can we ramp the electronics HV up and down with the beam structure?

  9. Conclusions • These are only first thoughts • Moving from concept to the real thing always raises lots of practical issues • Manchester has long detector-building tradition and experience. We’ve been through this cycle many times and know what sort of problems to anticipate • Anticipation and understanding can be crucial to success