1 / 29

Qom Wastewater Treatment Plant 2 nd Module

Owner: Qom Water & Wastewater Co. Finance Department: Islamic Development Bank. Project Management: Karavar Co. Consultant: Iran Ab Consulting Engineers. Qom Wastewater Treatment Plant 2 nd Module. Contractor: Zolal Iran Co. Project Report : November 2013.

etoile
Download Presentation

Qom Wastewater Treatment Plant 2 nd Module

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Owner: Qom Water & Wastewater Co Finance Department: Islamic Development Bank Project Management: Karavar Co Consultant: Iran Ab Consulting Engineers Qom Wastewater Treatment Plant 2nd Module Contractor: Zolal Iran Co Project Report : November 2013

  2. FARS News Agency – 2013.Sep.10 آقای توکلی بینا - مدیر عامل شرکت آب و فاضلاب استان قم : سازه های مدول دوم فاضلاب قم با پیشرفت 50% روبرو بوده است . وی روند پیشرفت پروژه را مثبت ارزیابی کرد و اظهار داشت: با وجود به تمام مشکلات موجود از جمله مسائل مالی، پیمانکار توانسته با برنامه‌ریزی مناسب این پروژه را به جلو ببرد. Mr. TavakoliBina, CEO of Qom Water & Waste Water Co.: "50% progress in Construction Qom WWTP 2nd Module“ "Despite of economical problems, The Contractor could perform positive progress applying suitable planning." • آقای مرادی - رئیس دیوان محاسبات استان قم: • نباید اجازه دهیم که مشکلات، اجرای این پروژه را با تهدید روبه‌رو کند زیرا این پروژه با سلامت جامعه در ارتباط است. • با توجه به اینکه این پروژه از تسهیلات بانک توسعه اسلامی بهره‌مند است نیازمند رایزنی کشوری هستیم تا با رفع مشکلات، پروژه طبق جدول زمان‌بندی به پایان برسد زیرا در غیر این صورت، مشکلات دوچندان خواهند شد. Mr. Ghanbari, Computation Bureau of Qom State: "… This Project has direct correlation with social health" " … It needs to negotiate with government managers in order to finish the Project at the planned date. Otherwise, the problems will be doubled.

  3. Mehr News web site – 2013.Oct.12 Mr. Janbaz, CEO of Water & Waste Water Engineering Company of Iran: The most modern WWTP is going to be constructed in Qom دکتر جانباز - مدیر عامل شرکت مهندسی آب و فاضلاب کشور: یکی از مدرن ترین تصفیه خانه های فاضلاب ایران در قم احداث می شود

  4. Summary of Contract Owner: Qom Water & Wastewater Co Finance Department: Islamic Development Bank Project Management: Karavar Co Consultant: Iran Ab Consulting Engineers Contractor : Zolal Iran Co Scope: Design, Build and Operate of QWWTP-2th Module Price: 256,323,828,174 IRR & 7,565,520 € Duration: 36 Months Project Start Date: 2011/11/22 Base Plane Finish Date: 2014/11/22 ( Replan 01) Forecast Finish Date: 2015/08/21

  5. PriceSchedule

  6. Cost Breakdown

  7. Project Overall Status

  8. TOTAL PROGRESSCut off Date(DEC,03,2013)

  9. Total Progress S-Curve

  10. Procurement Status

  11. Construction Phase (Civil Work)

  12. Main Volume Table

  13. AERATION TANK & ANAEROBIC SELECTOR UNIT

  14. PRIMARY SETTLING TANK

  15. FINAL SETTLING TANL

  16. SLUDGE ANAEROBIC DIGESTER

  17. SLUDGE THICKENER

  18. WAS TANK

  19. AERATION UNIT BLOWER

  20. GRIT & GREASE COLLECTING PLANT

  21. CHLORINATION CONTACT BASIN

  22. SECONDARY SCUM & RETURN & EXCESS SLUDGE PUMPING STATION

  23. BY PASS CHANNEL

  24. INLET DISTRIBUTION

  25. 2012/10/01 2013/02/25

  26. 2013/05/08 2013/07/29

  27. 2013/09/29 2013/11/28

  28. Qom Wastewater Treatment Plant ZolalIran Co

More Related