1 / 10

Variances ID areas where flood boundaries exceed zoning (e.g. jurisdiction of marsh act )

Legislative Boundaries. MMRA Mandate = protect agricultural land (allows periodic flooding) boundary based on HWL (CGVD28 datum) from 1950s, unique to each marsh body. Tregothic Marsh (Windsor): Total assessed value = $31,003,300

evania
Download Presentation

Variances ID areas where flood boundaries exceed zoning (e.g. jurisdiction of marsh act )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Legislative Boundaries • MMRA Mandate = protect agricultural land (allows periodic flooding) • boundary based on HWL (CGVD28 datum) from 1950s, unique to each marsh body • Tregothic Marsh (Windsor): • Total assessed value = $31,003,300 • yet agricultural land ~0.6%, majority commercial or government infrastructure • Variances • ID areas where flood boundaries exceed zoning (e.g. jurisdiction of marsh act)

  2. Two animated slides removed to reduce file size.

  3. Assessment & Engineering Crest Elevations & Footprints • ‘critical’ elevation determined for each marsh body (based on HWL & exposure) • ‘construction’ elevation = 2 ft + critical • in order to maintain slope, as increase height, must increase footprint • Original Fundy design: • 1:3 seaward • 1:2 landward

  4. Town of Wolfville • 210 m < critical • 3.7% of dyke length • foreshore mean = 220 m

  5. Mechanisms of Dyke Failure

  6. Assessment & Engineering Bishop Beckwith Erosion & foreshore marsh • foreshore marsh is critical for erosion protection & source of material (borrow pit) for dyke topping to decrease cost • 1 m water depth – wave dissipation in 80 m Starrs Point

  7. Assessment & Engineering Legislative Boundaries • Important to re-examine marsh body boundary • In many areas, strong match with historical HWL survey and lidar analysis. • However, HWL determined from 1940s and did not consider CC • Extend boundary if minimal development

  8. Adaptation Options

  9. Protect • hold the line & protect assets • topping requires increase in base footprint, potentially extend dyke • source of material (cost) • armouring (toe of dyke or foreshore) • cost benefit analysis required Source: Pilarsky, 1998

  10. Example of cost assessment for dyke heightening in the Netherlands (van Alphen, 2012) The economic optimum level of protection is where the sum of investments in dikes and residual damage (continuous line) shows a minimum, i.e. where further increase of dike height doesn’t outweigh the related avoided damage anymore.” (van Alphen, 2012). Cost of heightening or damage (M$) Dyke heightening (cm)