Historic Preservation of the Dinky in both Function and Form Alain L. Kornhauser, PhDProfessor, Operations Research & Financial EngineeringDirector, Program in Transportation Faculty Advisor, Princeton Autonomous Vehicle Engineering (PAVE) Founder, ALK Technologies, Inc. Chairman, Advanced TRansit Association (ATRA) and Vice Chairman, New Jersey Commission on Science and Technology (inactive)
Purpose of Historical Preservation • Preserve the Function and Form of Historically Important elements of the Built Environment. • Dinky: • Functioning since 1865 • Current Form since about 1915 • Station moved in about 1986 to current location
Purpose of Historical Preservation • Preserve the Function and Form of Historically Important elements of the Built Environment. • Dinky: • Functioning since 1865
Function Endangered? Only if Moved Away from “Nassau Street”
Princeton – Princeton Jct. (2.7 Miles) Location !, Location !, Location! Access to the World 12,000 Residents (Boro) 10,000 Students (PU, Seminary, Rider) 30,000 Jobs (Boro + Twnshp; Census)
50% Walk & Ride ~500 patrons/day 43/150 Solid Top 30%
Pre-1985 to Present Terminus ~185 feet http://www.daftlogic.com/projects-google-maps-distance-calculator.htm
Princeton – Princeton Jct. (2.7 Miles) Location !, Location !, Location! 12,000 Residents (Boro) 10,000 Students (PU, Seminary, Rider) 30,000 Jobs (Boro + Twnshp; Census)
Area around the Dinky Station Dinky Station Parking Garage Faculty Road Alexander Road Arts District
Definitions The Conflict This would be the 3rd time the station has moved towards The junction.
It then 2st moved 170 feet to create better E-W mobility for Forbes Student from: the end of the platform, to: the Freight Building The Conflict Arises from the current 3rd attempt at a Dinky Land Grab Land Grab
Walk&Ride Accessibility Lost by Moving the Dinky Terminus South • Assumptions: • 1. All walk in a straight line to the station • All Walk&Ride trips production/attraction are uniformly distributed in the half plane north of the current terminus. • Walk&Ride Area Lost =~ R*D*(2*cosq + sin q ) where R = prime walk distance • D = Distance Terminus moved (460 ft) • q = sin-1 (D/R)
¼ Mile Walk&Ride Accessibility Analysis http://www.daftlogic.com/projects-google-maps-distance-calculator.htm ¼ Walk&Ride Service Areas 49% Prime Walk&Ride Area Lost http://www.daftlogic.com/projects-google-maps-distance-calculator.htm Nothing is gained to the south to off-set the losses to the north http://www.daftlogic.com/projects-google-maps-distance-calculator.htm
1/2 Mile Walk&Ride Accessibility Analysis http://www.daftlogic.com/projects-google-maps-distance-calculator.htm 1/2 Walk&Ride Service Areas 24% Prime Walk&Ride Area Lost http://www.daftlogic.com/projects-google-maps-distance-calculator.htm Nothing is gained to the south to off-set the losses to the north http://www.daftlogic.com/projects-google-maps-distance-calculator.htm
Conclusions: Walk&Ride Accessibility Analysis • 49% loss of ¼ mile prime walking area implies loss of Walk&Riders could be as high as 49% and a 25% loss of Dinky ridership. • 24% loss of ½ mile walking area implies at least a 24% loss of Walk&Riders and at least a 13% loss of Dinky ridership
Minimal Conflicts; Readily Accommodates Pedestrians
50% Walk & Ride ~500 patrons/day 43/150 Solid Top 30%
Dinky / McCarter Parking ~7 Existing Dinky Parking On-street: ~100 Small lot: ~62 Commute Lot : ~150 Total: ~340 Yield: ~375 Boarders/day; ~680 McCarter Patrons 25 26 Kiss&Ride 32 FreeB, taxi ~10 62 62 Baker surface lot ~150 (Commuter Lot) 178 (Each Floor of Lot 7)
Area around the Dinky Station Dinky Station Parking Garage Faculty Road Alexander Road Arts District
Definitions The Conflict This would be the 3rd time the station has moved towards The junction.