C_TS422_2020 Free Questions C_TS422_2020 Free Questions SAP Certified Application Associate - SAP SAP Certified Application Associate - SAP S/4HANA Production Planning and S/4HANA Production Planning and Manufacturing Manufacturing https://www.passquestion.com/ https://www.passquestion.com/C_TS422_2020 C_TS422_2020.html .html
Question 1 Question 1 Where do you maintain the duration of a production operation? Where do you maintain the duration of a production operation? A. Bill of material (BOM) A. Bill of material (BOM) B. Work instructions B. Work instructions C. Material master C. Material master D. Routing D. Routing Answer: D Answer: D
Question 2 Question 2 You want to triggering-house production of a semi-finished mater al before a sales order You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? for the semi-finished material? A. Make-to-order production (20) A. Make-to-order production (20) B. Planning without final assembly (50) B. Planning without final assembly (50) C. Planning with final assembly (40) C. Planning with final assembly (40) D. Planning at assembly level (70) D. Planning at assembly level (70) Answer: B Answer: B
Question 3 Question 3 In a production process, you need acertain amount of liquid as input material. The source tank is In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. directly connected to the reactor. How can you process consumption postings? How can you process consumption postings? A. Kanban A. Kanban B. Picking list B. Picking list C. Backflushing C. Backflushing D. Transfer Order D. Transfer Order Answer: B Answer: B
Question 4 Question 4 For a production version to be valid and consistent what requirements must be fulfilled? For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question. Note: There are 3 correct answers to this question. A. The lot size range must be within the lot-size range of the assigned routing. A. The lot size range must be within the lot-size range of the assigned routing. B. The assigned routing must be a rate routing. B. The assigned routing must be a rate routing. C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. E. The assigned routing must NOT have alternative sequences. E. The assigned routing must NOT have alternative sequences. Answer: A,C,D Answer: A,C,D
Question 5 Question 5 Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question. correct answers to this question. A. Functional Location BOM A. Functional Location BOM B. Sales Order BOM B. Sales Order BOM C. Class BOM C. Class BOM D. Work Center BOM D. Work Center BOM Answer: A,B Answer: A,B
Question 6 Question 6 What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question. this question. A. Market intelligence A. Market intelligence B. Past quotation quantities B. Past quotation quantities C. Past procurement quantities C. Past procurement quantities D. One-off events D. One-off events E. Past sales order quantities E. Past sales order quantities Answer: A,D,E Answer: A,D,E
Question 7 Question 7 In your project,you have several materials that are planned by different people. In your project,you have several materials that are planned by different people. How can How can you assign the planning responsibility? you assign the planning responsibility? A. MRP type A. MRP type B. MRP group B. MRP group C. MRP controller C. MRP controller D. MRP planning file D. MRP planning file Answer: C Answer: C
Question 8 Question 8 What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question. There are 3 correct answers to this question. A. Stock transport order A. Stock transport order B. Production order B. Production order C. Scheduling agreement schedule line C. Scheduling agreement schedule line D. Purchase requisition D. Purchase requisition E. Planned order E. Planned order Answer: C,D,E Answer: C,D,E
Question 9 Question 9 You want to reduce planning efforts for B/C materials. You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend? Which planning procedure do you recommend? A. Manual planning without check A. Manual planning without check B. Forecast planning B. Forecast planning C. Material requirements planning C. Material requirements planning D. Consumption-based planning D. Consumption-based planning Answer: D Answer: D
Question 10 Question 10 How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question. answers to this question. A. Documentation of quality data with Quality Management A. Documentation of quality data with Quality Management B. Predefined GMP compliant process order types to meet audit requirements B. Predefined GMP compliant process order types to meet audit requirements C. Use of the GMP compliant flag in relevant master data applications C. Use of the GMP compliant flag in relevant master data applications D. Use of the digital signature function to check and run business processes D. Use of the digital signature function to check and run business processes E. Recipe approval (with Engineering Change Management) E. Recipe approval (with Engineering Change Management) Answer: A,D,E Answer: A,D,E