An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Few Issues Regarding the Use of Q2 (and related) products and software at NCEP/EMCCurtis H. MarshallNCEP/EMCQ2 Science WorkshopNSSLNorman, OKJune 28-30 2005

  2. Background • Currently: NCEP/EMC uses Stage II/IV for precipitation assimilation in NDAS • model is nudged to observed precipitation during assimilation cycle • model temperature, moisture, and cloud fields are adjusted to be more consistent with observed precipitation • also: land-surface model receives the observed precipitation (in lieu of model precipitation) -> influence on surface energy budget and subsequent convective precipitation

  3. Background • Current work: towards “assimilation” of cloud and hydrometeors • first step: using Z-R and Z-M relationships, develop forward model and nudge model hydrometeor concentrations • adjust model temperature, moisture, and momentum fields to be consistent with “observed” hydrometeors • PRELIMINARY target: WRF-NMM implementation in March 2006

  4. The Plan • Required data: gridded, quality-controlled WSR-88D reflectivity data • Level-II data stream now flowing through LDM/TOC into NCO • Adapt NSSL single radar QC code at NCEP (currently underway) • Use NSSL reflectivity Mosaic code to construct national realtime mosaic operationally at NCEP • Nudge towards the 3-D analysis of reflectivity in WRF-NMM data assimilation cycle

  5. Potentially…. • Distribution of reflectivity mosaic to service centers and other customers? • Hosting an operational version of NMQ on NCEP computing platform? • Production and distribution of other NMQ (e.g., QPE) products?

  6. … Some Issues • The requirement must be defined for NCEP • Need assurances of operational support (who to call 24/7 if something goes awry?) • Would like to see a side-by-side long-term (annual cycle?) verification of NMQ QPE against Stage II/IV • NCEP NOT in a position to provide end user support to potential customers of NMQ products!

  7. FEEDBACK?Thanks!