1 / 2

Strategic Plan 2009-2013 and the task M7

Strategic Plan 2009-2013 and the task M7. Tasks for the Strategic Plan 2009-2013 were presented Tasks for TD Management proposed: Cost for maintenance and operation Networks-Data-Performance indicators Long term investments in road infrastructure (same as M7) Research

eze
Download Presentation

Strategic Plan 2009-2013 and the task M7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Plan 2009-2013 and the task M7 • Tasks for the Strategic Plan 2009-2013 were presented • Tasks for TD Management proposed: • Cost for maintenance and operation • Networks-Data-Performance indicators • Long term investments in road infrastructure (same as M7) • Research • Result of SP tasks gradings by the GB and EB was that there was not enough interest shown by the member countries in the task M7 (only 4 times grade 4, and nobody ready to take over the leadership), see excel sheet

  2. Question • Shall the group go on with the task M7 if the leaders in members countries haven‘t much interest in it? • At GB meeting in Malta, Mr Parisé had announced that France would lead a comparative survey about maintenance and operation costs in detail and asked for a few member countries to be seriously engaged in the work. Shall we share their results or join them in their analysis? • The group‘s action plan is the following: • M1: Final report will be presented in June 2008. • M4: Final report will be presented in June 2008. • M6: Final report may be introduced in the beginning or in the end of 2009. • M7: In the 2008 the group will work on best practice guide and then will introduce iterim report and final report in the year of 2009.

More Related