1 / 7

FWD DETECTORS 11-03-2003

FWD DETECTORS 11-03-2003. ALICE FORWARD DETECTORS  workshop. AGENDA Tuesday, March 11th, 2003 at 09.15. 160-R-009 Introduction and main deadlines, Jens Jørgen Gaardhøje (10') Integration status. Lars Leistam and/or Ch. Gregory (25')

falala
Download Presentation

FWD DETECTORS 11-03-2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FWD DETECTORS 11-03-2003 ALICE FORWARD DETECTORS  workshop. AGENDA Tuesday, March 11th, 2003 at 09.15. 160-R-009 • Introduction and main deadlines, Jens Jørgen Gaardhøje (10') • Integration status. Lars Leistam and/or Ch. Gregory (25') • Presentation of FWD dets. integration coord. Ettore Rosso. (10') • News and update on status of the  T0 (W. Trzaska, V. Grigoriev) (25')                   V0 (Jean Yves Grossiord, Ana Becerill) (25')  Si-FMD (Børge Svane Nielsen ) (25') 5. Discussion on TDR planning (60'). Lunch 6. Latest on FMD simulations,  Alla Maievskaia. (20') 7. Update on Greek DAQ efforts, Martha Spyropoulou-Stassinaki (20') 8. DCS status (if needed, re. DCS meeting on monday) 9. AOB

  2. Main FWD Events 1. Wednesd. 12-3-03 Forum: T0 (WT), V0(JYG) 2. Frid. 14-3-03 Installation Review: ITS+FWD (FT) 3. Tuesd. 25-3-03 11.00-12.30 Comprehensive Review : T0+V0+FMD (WT, JJG) 4. (?) TDR editorial meeting. Alice week? 5. Summer ’03. TDR 6. July-Nov ’04. Pre-Assembly Test. (Vac.Ch., ITS, T0,V0,Si-FMD, TPC …) • April-May ’06. Install V0, T0, Si-FMD on muon side • June ’06 TPC slide in. TPC finished in November. • End ’06. Install V0,T0,Si-FMD on left side.

  3. TDR layout Alice collab list.  (5pgs) Summary of  contents  (2pgs) Table of contents. List of tables and figs. (4pgs) Color pictures of selected det. elements etc.  (6pgs) 1. Physics objectives and design considerations    T0, V0, Si-FMD    trigger, timing, on-line mult, off-line mult, fluct, bgd rejection, overall performance, coverage etc ... (10 pgs)  2. Design objectives, mechanical structure, Integration    T0, V0, Si-FMD mounting, tolerances, clearances, inst. seq., cooling, cabling ...  (10pgs) 3. T0  (30 pgs) 4. V0  (30 pgs) 5. Si-FMD  (30 pgs) 6. Installation, slow control, DAQ, safety.  (10 pgs) 7. Organization (5 pgs)     Group org., construction, installation, cost  8. References.  (4pgs) 9. Index (2 pgs) (approx. 150 pgs)

  4. Si-FMD 5. Si-FMD 5.1 Overview and objectives 5.2 General design and geometry 5.3 Si-sensor design 5.4 FEE electronics (w/ prototype tests) 5.4.1 Pre ampl. Board 5.4.2 Digitizer Board 5.5 BE and RO electronics (w/ prototype) 5.5.1 Read-out unit 5.5.2 DDL and Receiver unit 5.6 Power and cables 5.7 DAQ and DCS 5.8 Calibration, maintenance/repair 5.9 Services, mechanical mounting, alignment, installation 5.10 Performance

  5. T0 • 3. T0

  6. V0 4. V0

  7. Responsibilities and time table • Main editorial/coordination group. • Technical editor • Chapter editors/responsible (need ’indians’) • Figures/tables • Draft of indiv. Chapters: April 15. Identifying missing items. • 1rst complete draft: 1. May 2003 • In depth internal grp. Review: June ALICE week. • Circulation of draft in collab. : July 1rst. • Revision of document: August 2003 • Printing :october 2003 Format: LateX or Word:

More Related