90 likes | 184 Views
INTERREG III: STARDUST. January 2003- September 2003. VLIZ. First joint sampling expedition Rupel River. Sampling site. Intertidal flat: easily sampled at low tide expect relatively contaminated sediments organic rich sediments. Porewater analysis by DGT/DET/coring. Aim.
E N D
INTERREG III: STARDUST January 2003- September 2003 VLIZ Lille, 18/09/03
First joint sampling expedition Rupel River Sampling site • Intertidal flat: easily sampled at low tide • expect relatively contaminated sediments • organic rich sediments Lille, 18/09/03
Porewater analysis by DGT/DET/coring Aim • Interlaboratory intercomparison • identify problems • establish protocol for further work Methods used • Coring by hand • porewater separation: on field USTL, in lab VUB • cores for DGT and DET transported to the lab • DGT and DET probes deployed at room temperature for 24h (2 cores) • USTL: DGT diffusive gels 0.8 and 1.2mm • in same core • VUB: DGT diffusive gels 0.8 and 0.8mm • in different cores Lille, 18/09/03
DET DGT Fe As Lille, 18/09/03
DGT VUB DGT USTL DET USTL centrifugation Lille, 18/09/03
DGT VUB DGT USTL centrifugation Lille, 18/09/03
DGT USTL DGT VUB Ni Cu Lille, 18/09/03
DGT VUB DGT USTL centrifugation DET USTL Lille, 18/09/03