Mid of Semester Presentation Heng Chen & MyungJoo Ko 10-17-2003

Mid of Semester Presentation Heng Chen & MyungJoo Ko 10-17-2003. Team Dumbledore: Heng Chen Myung-Joo Ko Neel Mullick Paulo Merson. Agenda. The ArchE System What Have We Done So Far Process & Management Requirements Technical Issues Fall semester deliverables Risks

fauna
Download Presentation

Mid of Semester Presentation Heng Chen & MyungJoo Ko 10-17-2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mid of Semester PresentationHeng Chen & MyungJoo Ko10-17-2003 Team Dumbledore: Heng Chen Myung-Joo Ko Neel Mullick Paulo Merson

  2. Agenda • The ArchE System • What Have We Done So Far • Process & Management • Requirements • Technical Issues • Fall semester deliverables • Risks • Questions to Mentors

  3. ArchE The ArchE System Requirements in various forms Available knowledge System Designer Architecture

  4. What Have We Done So Far • Process and management • Requirements • Technical Issues

  5. Process and Management • Process discussion – RUP/XP/TSP/ACDM • Role definitions (RUP) • Goals and vision discussion (TSP) • Time tracking (TSP) • SCMP • SOW (draft)

  6. Process and Management (cont.) • SPMP • Meeting & Review Process (TSP) • Requirements Management Plan • Risk Management Plan • Roles today: • Team lead: Neel • Process manager: Myung • Customer manager: Henry • Configuration manager: Paulo • Milestones (Fall Semester) • Microsoft Project Plan

  7. Requirements • Elicitation: • Client meetings • Interview • Expression: • Use case modeling (for prioritization) • Validation • UI prototyping

  8. Technical Issues • VSS repository • Jess academic license

  9. Fall Semester deliverables • Process • Estimation Plan • Quality Assurance Plan • Management • Signed Statement of Work • SRS • SPMP • Technical • UI Prototype • Notional Architecture • Choice of tools

  10. Risks • Scope still needs to be defined • Evolving core of ArchE • Extensive inter-operability • Feature rich interface in Java

  11. Questions to Mentors • Do we still need to name a ‘governing’ process? • Accurate estimates are required for scoping. And we have no basis for estimating.

  12. Questions ?