An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMWG – Workflow subWGJuly 26th , 2011 Draft 0.2 IMWG - Workflow sub working group - draft 0.2 - Proposal

  2. Roles • Tables willbedrawn for eachsteps and each area withassociatedrights IMWG - Workflow sub working group - draft 0.2 - Proposal

  3. General workflow Equipment group Pre-scheduling Coordination team Pre-scheduling Request Technical Approval Riskanalysis Scheduling Follow-up Safetyforms Closure IMWG - Workflow sub working group - draft 0.2 - Proposal

  4. Request for an Activity (AR) Login Find an existing AR Choose AR from catalog Fill new AR Cancel AR  Clone AR Complete/modify AR  Submit AR to System coordinator Approved by System coordinator  Reject AR Save AR Insert ARin catalog Submit AR • Notes •  Document the reason of the rejecting / cancel ? & inform requester •  Checks, mandatory fields : waiting data model • Depending on groups (a matrix shall be written) •  Based on location and time period (LHC machine) •  Mail send to coordination teams. This depends on areas & time period • General - TIOC: check boxes can be tagged/untagged by creator or coordination or TIOC Assign ARto the adequate coordination team  Approve AR IMWG - Workflow sub working group - draft 0.2 - Proposal Phase II

  5. Technical Approval Assign ARto the adequate coordination team TIOC check not needed Approved by TIOC ?  Propose new dates Check consistency of information Fields modified and need a formal approval from system coordinator?  1st Check of proposed dates/duration w.r.t schedule Technical approval needed ? Decision? RejectAR  Approve AR RejectAR  Approve AR Scheduling IMWG - Workflow sub working group - draft 0.2 - Proposal • Notes • TIOC will mention if he cares about dates modification or not • Document the reason of the rejecting ? & inform requester – Send back to System coordinator •  EDMS number, or meeting reference or doc. attached Phase II

  6. Scheduling Approve AR Check proposed dates/duration with current coordination schedule  Insert scheduled – baseline – access dates Dates proposed dates scheduled & TIOC cares about dates TIOC appoval ?  Inform System coordinator Follow-up Notes Possibility to accept a batch of activity  This will be mostly like done orally Phase II IMWG - Workflow sub working group - draft 0.2 - Proposal

  7. Follow-up Safety form(s) approved Filters (transport, list of activities /location /day..) Either coord. Team / requester Propose new dates Schedule Lock-out RP module (material & transport) To bediscussed Approval of new dates Beware of linked activity in the future. If any change how do we announce the changes on following activity Insert scheduled – baseline – access dates Safety approval Inform requester by mail (with dates?) Do we have to launch again safety form(s) ? • In parallel • VIC (froma phone call of safety coordination – Activity can be paused) • Possibility to enter comments on progress (from anyone) Phase II IMWG - Workflow sub working group - draft 0.2 - Proposal

  8. Complete workflowuntilscheduling Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop.  dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal July 26th, 2011

  9. Use case 1 : T. stops LHC machine – TIOC needed Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop.  dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal

  10. Use case 2: Operation - ASAP Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop.  dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal July 26th, 2011