IMWG – Workflow subWG July 26 th , 2011. Draft 0.2. Roles. Tables will be drawn for each steps and each area with associated rights. General workflow. Equipment group Pre - scheduling. Coordination team Pre - scheduling. Request. Technical Approval. Risk analysis.
E N D
IMWG – Workflow subWGJuly 26th , 2011 Draft 0.2 IMWG - Workflow sub working group - draft 0.2 - Proposal
Roles • Tables willbedrawn for eachsteps and each area withassociatedrights IMWG - Workflow sub working group - draft 0.2 - Proposal
General workflow Equipment group Pre-scheduling Coordination team Pre-scheduling Request Technical Approval Riskanalysis Scheduling Follow-up Safetyforms Closure IMWG - Workflow sub working group - draft 0.2 - Proposal
Request for an Activity (AR) Login Find an existing AR Choose AR from catalog Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to System coordinator Approved by System coordinator Reject AR Save AR Insert ARin catalog Submit AR • Notes • Document the reason of the rejecting / cancel ? & inform requester • Checks, mandatory fields : waiting data model • Depending on groups (a matrix shall be written) • Based on location and time period (LHC machine) • Mail send to coordination teams. This depends on areas & time period • General - TIOC: check boxes can be tagged/untagged by creator or coordination or TIOC Assign ARto the adequate coordination team Approve AR IMWG - Workflow sub working group - draft 0.2 - Proposal Phase II
Technical Approval Assign ARto the adequate coordination team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from system coordinator? 1st Check of proposed dates/duration w.r.t schedule Technical approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Scheduling IMWG - Workflow sub working group - draft 0.2 - Proposal • Notes • TIOC will mention if he cares about dates modification or not • Document the reason of the rejecting ? & inform requester – Send back to System coordinator • EDMS number, or meeting reference or doc. attached Phase II
Scheduling Approve AR Check proposed dates/duration with current coordination schedule Insert scheduled – baseline – access dates Dates proposed dates scheduled & TIOC cares about dates TIOC appoval ? Inform System coordinator Follow-up Notes Possibility to accept a batch of activity This will be mostly like done orally Phase II IMWG - Workflow sub working group - draft 0.2 - Proposal
Follow-up Safety form(s) approved Filters (transport, list of activities /location /day..) Either coord. Team / requester Propose new dates Schedule Lock-out RP module (material & transport) To bediscussed Approval of new dates Beware of linked activity in the future. If any change how do we announce the changes on following activity Insert scheduled – baseline – access dates Safety approval Inform requester by mail (with dates?) Do we have to launch again safety form(s) ? • In parallel • VIC (froma phone call of safety coordination – Activity can be paused) • Possibility to enter comments on progress (from anyone) Phase II IMWG - Workflow sub working group - draft 0.2 - Proposal
Complete workflowuntilscheduling Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop. dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal July 26th, 2011
Use case 1 : T. stops LHC machine – TIOC needed Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop. dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal
Use case 2: Operation - ASAP Login Find an existing AR Fill new AR Cancel AR Clone AR Complete/modify AR Submit AR to Syst. Coord. Approved by Syst.Coord. Reject AR Save AR Submit AR Assign ARto the Coord. team TIOC check not needed Approved by TIOC ? Propose new dates Check consistency of information Fields modified and need a formal approval from syst. Coord.? Tech.approval needed ? Decision? RejectAR Approve AR RejectAR Approve AR Insert dates Dates prop. dates sched.& TIOC cares about dates TIOC appoval ? Inform Syst. Coord. Safety forms Follow-up IMWG - Workflow sub working group - draft 0.2 - Proposal July 26th, 2011