1 / 13

Fraunhofer visit | May 2013

Fraunhofer visit | May 2013. nan FIP project. FieldDrive Validation. Eva Gousiou BE/CO-HT. WorldFIP & the FielDrive. WorldFIP FIELDBUS.

felice
Download Presentation

Fraunhofer visit | May 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fraunhofer visit | May 2013 nan FIP project FieldDrive Validation Eva Gousiou BE/CO-HT

  2. WorldFIP & the FielDrive WorldFIP FIELDBUS sensor sensor sensor WorldFIP Master … FIEDRIVE FIEDRIVE FIEDRIVE WFIP agent WFIP agent WFIP agent

  3. WorldFIP & the FielDrive WorldFIP FIELDBUS • 4’000 purchased devices • No informationyet on the number of different batches • Analog and digital part • Used always in companion with WFIP agent with TID lifetime 400 Gy sensor sensor sensor WorldFIP Master … FIEDRIVE FIEDRIVE FIEDRIVE WFIP agent WFIP agent WFIP agent • No dedicated tests, but there is some confidence • Several groups tested at CNGS, LHC • Parasitically 2 devices at PSI; up to 400 Gy and up to 700 Gy

  4. Preliminary Test PlanCo60 Passive Tests • Passive Tests • Steps at 200 | 400 | 600 | 800 Gy • For each step 5 devices per batch • Devices delivered at CERN for validation on NFTC board • Components and NFTC validation board available in ~ 1 month

  5. Preliminary Test PlanCo60 Active Tests • Active Tests • Irradiation of FIPdiag boards • Boards should be failing at WFIP agent lifetime 400 Gy • 10 boards available

  6. Preliminary Test PlanCo60 Active Tests Setup Control Room FIELDBUS Master

  7. Preliminary Test PlanCo60 Active Tests Setup Control Room FIELDBUS Master

  8. Preliminary Test PlanCo60 Active Tests Setup Control Room FIELDBUS Master

  9. Preliminary Test PlanCo60 Active Tests Setup Control Room Control Room FIELDBUS Master • 9V • USB 50m 50m

  10. Extras

  11. FielDriveFieldTR tests • Study of failures of the digital parts • PSI targeted beam • ~5 nanoFIP test boards • Study of failures of the analog parts • Fraunhofer; irradiation of complete boards • ~5 nanoFIPdiag boards

  12. WorldFIP, microFIP & nanoFIP (I) • WorldFIP is a real-time fieldbus used at CERN's LHC for a variety of control systems: Cryogenics, Power Converters, Quench Protection, Beam Instrumentation, Radiation Monitoring, Survey • More than 10000 WorldFIP client nodes (agents) and 200 WorldFIP master nodes installed in the LHC • WorldFIP was selected because of the good performance of its agents under radiation WorldFIP Architecture User logic User logic User logic sensor sensor actuator WorldFIP Master WFIP agent WFIP agent WFIP agent FIELDBUS … FIELDRIVE FIELDTR FIEDRIVE FIELDTR FIELDRIVE FIELDTR FIELDRIVE FIELDTR

  13. WorldFIP, microFIP & nanoFIP (I) • WorldFIP is a real-time fieldbus used at CERN's LHC for a variety of control systems: Cryogenics, Power Converters, Quench Protection, Beam Instrumentation, Radiation Monitoring, Survey • More than 10000 WorldFIP client nodes (agents) and 200 WorldFIP master nodes installed in the LHC • WorldFIP was selected because of the good performance of its agents under radiation WorldFIP Architecture sensor sensor sensor WorldFIP Master WFIP agent WFIP agent WFIP agent FIELDBUS … FIEDRIVE FIEDRIVE FIEDRIVE FIELDRIVE FIELDTR

More Related