An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Offline status report LNF 19 Sep 07

  2. News: • MC04 all LSF=1 completed (~535 pb-1) • mrc dst of 2005 with correct +-e+e- ~completed (1.13 fb-1 done, 95%). • MC all_phys2 (dtr_gb_nr=1) started for 2004 data: 400 pb-1@LSF=0.5 done in ~15 days, 26pb-1/day • New request (P. Beltrame): production of 250 pb-1 Bhabha at 1 GeV, =420 nb, LSF = 2. Estimate rate 60pb-1/day, 1 week to complete. • “Organizational” news: R. Versaci deputy convener

  3. MC activity: summary of the productions done in 2006/07 • Production of ~1.2 fb-1 (2005 data) of: • K± rare decays (K±e, , e), • KS rare decays (KSe, , e, , 3 • KL rare decays (KL, , e, e,  • Production completed in 8 days of running. • Production of 240 pb-1 @ 1GeV of: • (e+e-) , =50 nb, LSF=6 • (e+e-) , =30 nb, LSF=6 • Production completed in 5 days of running. • Production of 1.74 fb-1f all 2004/05 (LSF=1) on 136 slots (  280 B80 CPU). • Production completed in ~4 months of running, average rate 18 pb-1/day. • The inefficiency for K± dst’s mostly caused by the 2GB limit for single file. They will be recovered in future.

  4. Status of reconstruction at Sep 07 trgmon luminosity in pb-1 by year and DBV Don’t have +-e+e-selection. We want to reprocess them OK First 125 pb-1 of 2004 show large time jitter. We will reprocess if needed.

  5. Short term activities: • Duplicate MC04/05 all statistics (~1.7 fb-1) ~120 days (started) • Reprocessing of 2005 data with DBV<25: ~80 days (1.1 fb-1) • Dst’s holes • Rad MC LSF = 5: ~10 days • Beltrame’s request: 250pb-1 of Bhabha at 1 GeV (~1 week) Within this schedule we should be able to finish this activity in ~7 months from now (i.e. March 08)

  6. Spares

  7. Monte Carlo production 2006/07 All the Monte Carlo produced before 2006 *w/out including MC dst’s

  8. Tape Storage (Sep 07) MC 217 TB Tot ~700 TB

  9. Offline resources: Disk space DSTs cached on nfs-mounted disks for fast analysis access DST size Current DST cache capacity: New purchases: 20 TB FC disk available (16.5 effective) Installed other 30TB Sata2 (22 effective) 38.5 TBavailable for disk cache *all_phys at LSF=2 + specific productions 11/19 TB in use for AFS storage

  10. Offline resources: CPU • KLOE CPU accounting is performed in B80 units • 1 “B80 CPU” = 1 P3 CPU installed in B80 server

  11. Attivita’ Offline 2006/07 • Attivita’ svolta nel 2006: • Ricostruzione dati Off-Peak (~280 pb-1), fino a Marzo • Preparazione e test della simulazione MC dei dati 2004/05 (~1.8 fb-1) • Simulazione MC  all dei dati 2005 (~1.2 fb-1), Agosto-Dicembre • Attivita’ svolta nel 2007: • Riprocessamento parte dei dati Off-Peak (~60 pb-1), Gennaio • Chiusura “buchi” della ricostruzione 2005 (~100 pb-1) • Riprocessamento dati 2004 (~535 pb-1) • Produzione MC canali specifici (K rari, ) • Simulazione MC  alldei dati 2005 (~535 pb-1), Giugno-Luglio • Attivita’ da svolgere nel 2007/08: • Duplicazione statistica MC  all 2004/05 (~1.7 fb-1) • Riprocessamento dati 2005 (~1.1 fb-1) • Chiusura buchi dst’s, produzione MC di canali specifici, altro… New In corso