1 / 2

MKI Work since 14/02/2011 and To Do Point 2:

MKI Work since 14/02/2011 and To Do Point 2: All eight electron-cloud coils installed (near warm-cold transition and pumping port ) – 1 of 2 power supplies installed; Christophe verified software changes; Equipment re-consigned (Wed 19/1/2011) for installation of coil power supplies.

ferris-ross
Download Presentation

MKI Work since 14/02/2011 and To Do Point 2:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MKI Work since 14/02/2011 and To Do • Point 2: • All eight electron-cloud coils installed (near warm-cold transition and pumping port) – 1 of 2 power supplies installed; • Christophe verified software changes; • Equipment re-consigned (Wed 19/1/2011) for installation of coil power supplies. • TO DO: • Pulse conditioning (ACOND) & waveforms verification scheduled for Monday 24/01/2011; • Carefully monitor TMR C & PFN C voltages • and identify cause of voltage reduction • that occurred between Dec. 4-6, 2010 • (possibly in DS tank ……). • Swap DS tanks between PFNs C & D: • during swap measure: • DS Charging resistor value (~75 Ω); • Parallel combination of voltage • divider and DS thyratron grading • circuit (~6.3 MΩ); • Parallel combination of PFN DC leakage • (~10 MΩ !) and MS thyratron grading • circuit (~30 MΩ); • In lab  total parallel resistance of ~3.4 MΩ. No coils by these flanges??... LIBD: 21 Jan 2011

  2. MKI Work since 14/02/2011 and To Do • Point 8: • Christophe verified software changes; • 7 of 8 eight electron-cloud coils installed (near warm-cold transition and pumping port) – no power supplies yet.: • TO DO: Pulse conditioning (ACOND) and verify waveforms. • MKE’s • MKE4: • Switched last weekend for power-cut: restarted conditioning (LHC) Monday; • Arretd’urgence tests stopped conditioning Tuesday morning – vacuum pumps stopped & magnet vacuum increased to ~5e-6mbar!: restarted conditioning Wednesday; • Tests of access system stopped conditioning (at 42 kV) Thursday afternoon; • Conditioning restarted at 14:55hrs today …… • Must stop conditioning next Monday evening for an intervention on water for a conventional magnet…. • MKE6: • TO DO; • Verify calibration (as far as possible) and pulse waveforms; • Check kick with beam???... LIBD: 21 Jan 2011

More Related