1 / 4

Summary of v05 DST Production

Summary of v05 DST Production. Final reconstruction pass for Year-01 data. Tatsuya Chujo (BNL) , Akio Kiyomichi (Univ. of Tsukuba) PHENIX Computing Meeting October 9, 2001. Production setup. v05 reconstruction setup ROOT and compiler version: ROOT-3.01/05, gcc-2.95.3

fidela
Download Presentation

Summary of v05 DST Production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of v05 DST Production Final reconstruction pass for Year-01 data Tatsuya Chujo (BNL) , Akio Kiyomichi (Univ. of Tsukuba) PHENIX Computing Meeting October 9, 2001

  2. Production setup • v05 reconstruction setup • ROOT and compiler version: • ROOT-3.01/05, gcc-2.95.3 • Tag version : v05 • Library version : pro.11 • except libmicroqm01.so, libpreco.so and libPdbCal.so • /afs/rhic/phenix/software/sys/i386_redhad61/pro.11/ • /phenix/workarea/phnxreco/phool/install/v05/lib/ • Output directory • In RCF disk (/phenix/data17/phnxreco/v05/) • DST : dsts/ • microDST : uDST/ • QA root file : qaroot/ • QA summary : qasummary/ • QA ps file : qaps/ • TOF tree file : toftree/ • standard output : stdout/ • standard error : stderr/ • In HPSS (/home/phnxreco/run2000/v05/) • same structure as above. • All DSTs are in HPSS • DST for 10545, 10603, 12466, 12468 are on disk • by Tarun‘s request If you need DST on disk, lets us know. For more detail, see the following www page. http://www.phenix.bnl.gov/WWW/run02/DPM/v05/v05_DST.htm Akio Kiyomichi [Univ. of Tsukuba]

  3. Production result Progress • Sep. 7, 2001 : Start V05 DST production • process rate ~100/day • Sep.17, 2001 : Upgrade Objectivity and PdbCal/preco • process rate ~300-500/day • Oct. 1, 2001 : Finished all processes • # of PRDFs = 4599 • # of successful DSTs = 4494 / 4599 • retried rate ~ 4% (mostly caused by Objy error) ========================= Reference: v03 DST Production (Dec, 2000) • # of successful DSTs = 2854 [by RCF], 1739 [by CCJ] • # of RCF or CCJ DSTs = 3736 Akio Kiyomichi [Univ. of Tsukuba]

  4. Event count • Count physics event by using ”nt_evt” in microDST. • Cut criteria: • (trigger&0x5002)>0 • |bbcz| <= 30 cm • npc1 >= 1 v05 DST • # of events = 3.37M (both field ON and OFF) • field ON : 2.6M • field OFF: 675K ========================= Reference: v03 DST Production (Dec, 2000) • # of event = 2.32M (both field ON and OFF) Akio Kiyomichi [Univ. of Tsukuba]

More Related