20 likes | 122 Views
Supplier Name. Revision. Serial Numbers. Leave this field empty. This is for the ship level part #, which PMC will fill in. Drawing Zone. Part Number. Part Name. Actual Measured Dimensions. Record the Date, Job/Shoporder #, & Total Quantity. Drawing Characteristic.
E N D
Supplier Name Revision Serial Numbers Leave this field empty. This is for the ship level part #, which PMC will fill in. Drawing Zone Part Number Part Name Actual Measured Dimensions Record the Date, Job/Shoporder #, & Total Quantity Drawing Characteristic Please provide your company’s 5 digit GE Supplier Code if applicable. Recommend your company record the name of the person whom performed the inspection. Note two serial numbers are listed since this nonconformance applies to 2 parts. In this case the actual measurement is the same for each part. If actuals are different each one should be listed or provided as an attachement. Provide a cause and corrective action for each nonconformance. In this case, both nonconformances were caused by the same problem.
Discrepant Material Report Checklist • Date, Job/Shoporder, & Quantity • Drawing number and revision • Part Name • Supplier Name and GEAE Supplier Code if applicable • Record nonconforming characteristic (include drawing zone) and actual measured value. • Record serial numbers. • In comments block provide the cause and corrective action for each nonconformance line item.