1 / 2

Record the Date, Job/Shoporder #, & Total Quantity

Supplier Name. Revision. Serial Numbers. Leave this field empty. This is for the ship level part #, which PMC will fill in. Drawing Zone. Part Number. Part Name. Actual Measured Dimensions. Record the Date, Job/Shoporder #, & Total Quantity. Drawing Characteristic.

fifi
Download Presentation

Record the Date, Job/Shoporder #, & Total Quantity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplier Name Revision Serial Numbers Leave this field empty. This is for the ship level part #, which PMC will fill in. Drawing Zone Part Number Part Name Actual Measured Dimensions Record the Date, Job/Shoporder #, & Total Quantity Drawing Characteristic Please provide your company’s 5 digit GE Supplier Code if applicable. Recommend your company record the name of the person whom performed the inspection. Note two serial numbers are listed since this nonconformance applies to 2 parts. In this case the actual measurement is the same for each part. If actuals are different each one should be listed or provided as an attachement. Provide a cause and corrective action for each nonconformance. In this case, both nonconformances were caused by the same problem.

  2. Discrepant Material Report Checklist • Date, Job/Shoporder, & Quantity • Drawing number and revision • Part Name • Supplier Name and GEAE Supplier Code if applicable • Record nonconforming characteristic (include drawing zone) and actual measured value. • Record serial numbers. • In comments block provide the cause and corrective action for each nonconformance line item.

More Related