SiLC beam test ’07: status and plans

SiLC beam test ’07: status and plans. Zden ě k Dolezal Charles University Prague SiLC WS, Prague April 2007. Facilities 2007-8. DESY: shutdown July 2007 Shutdown January-August 2008 CERN Available till LHC startup (used to be November 2007) LHC priority afterwards

Download Presentation

SiLC beam test ’07: status and plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SiLC beam test ’07:status and plans Zdeněk Dolezal Charles University Prague SiLC WS, Prague April 2007

  2. Facilities 2007-8 • DESY: • shutdown July 2007 • Shutdown January-August 2008 • CERN • Available till LHC startup (used to be November 2007) • LHC priority afterwards • TB again available after LHC commissioning (?months?) • FNAL • Meson testing beam facility available all the time • Beam structure not very suitable, but useable • Looks user-friendly • Logistics difficult

  3. Facilities 2007-8: infrastructure • DESY: • Everything tested in October • Telescopes available • CERN • Experience of LHC groups • No telescopes at the moment • FNAL • No telescopes at the moment

  4. Plans 2007 • DESY, June 4-15 • CERN, October 10-23

  5. What is needed? • Trigger + DAQ + Telescopes • Prototype modules + DAQ HW • DAQ software • Chamber, XY stage • Manpower (experts, shifters) • Data analysis

  6. What is available for DESY? • Trigger + DAQ + Telescopes: OK • Prototype modules + DAQ HW – see next slides • DAQ software: existing LabView, changes realistic? • Synchronisation: Canberra counter • Chamber: under construction in Paris • XY stage: OK • Manpower (experts, shifters): Hopefully OK, please come! • Data analysis: basic framework exists

  7. SiLC Prototype Modules IExisting

  8. Problems from 2006 • VA1 chips not responding at 2 modules: FIXED • Common mode/ pedestal changes: could be fixed by analysis, or grounding • Trigger frequency too low for stable running: is it fixed? • Dead time of LabView SW: is it better? • Multiple scattering from Tscopes and scintillator: new position between the telescopes

  9. SiLC Prototype Modules IITo be constructed

  10. What is available for CERN? • Trigger + DAQ + Telescopes: NO • Prototype modules + DAQ HW – to be discussed • DAQ software: existing LabView will be too slow • Synchronisation: Canberra not realistic in ~kHz rate counter • Chamber: DESY chamber can be reused • XY stage: not available • Manpower (experts, shifters): please plan to come! • Data analysis: basic framework exists, but with new HW&SW it should be updated

  11. Backup slides

  12. Trigger + DAQ+Telescopes ZEUS DESY group telescopes used (thanks to Tobias Haas, Uli Koetz, Jolanta Sztuk): trigger photomuliplier • 3 defining an area of 9x9 mm2 triggering the readout of the 3 telescope units telescope • 3 modules with crossed sensors about 3x3 cm2; diode pitch 25 micron, readout pitch 50 micron ("Cern type", Coledani et al., NIM372(1996)379 ) readout • CAEN module 550 and 551 in VME Power PC in the VME crate coincidence, deadtime control,... in a NIM crate in the hut. The VME crate is close to the telescope. Software and data format under investigations

  13. DAQ HW+SW Telescopes: • CAEN VME V550+551 ADC+sequencer • PowerPC in VME Crate, Lynx OS • DESY SW SiLC modules: • Interface card between UMC/VA chips and ADC • NI AD card, 100 MHz, 14 bit (PCI or PXI) • LabView DAQ SW • Readout speed limitations