Status of Front-end and Readout Electronics for July Test Beam. Ken Johns, Sarah Jones, Dan Tompkins (U. Arizona) Gianluigi De Geronimo, Jack Fried, Joe Mead, Vinnie Polychronakos (BNL) Sorin Martoiu (CERN) John Huth, Nathan Felt (Harvard). Most Recent VMM1 Readout Plan. New “C-Card”.
E N D
Status of Front-end and Readout Electronics for July Test Beam Ken Johns, Sarah Jones, Dan Tompkins (U. Arizona) Gianluigi De Geronimo, Jack Fried, Joe Mead, Vinnie Polychronakos (BNL) Sorin Martoiu (CERN) John Huth, Nathan Felt (Harvard)
New “C-Card” Existing BNL DAQ board with ADCs and Cyclone IV for readout, configuration AZ Adapter Card (V1) AVNET LX9 with Spartan 6 FPGA for ethernet connection to switch
VMM1 Readout Card Status • LH “Mini”-MMFE • Twelve boards due 6/12 • A few boards and parts will be sent to BNL 6/13 • Adapter V1 • Layout being finalized • 5 boards will be ordered this week – same time scale as Mini
VMM1 Readout Status • Adapter V2 • Same as V1 but with LVDS – RSDS level adapters • Possibly 5V input instead of 2.5V • Schematic will be updated this week • RH Mini-MMFE • Layout will start after Adapter V2 • Will include any feedback from tests at BNL