SCOPE OF WORK. CONTENT Task Detailed Design DELIVERABLE D. 7.1 Report on constructive design for the elements of the system. ACTIVITIES AND RELATIONS DETAILED DESIGN. INPUT. WP4, report on acceptance criteria and the testing procedures Design specifications
E N D
SCOPE OF WORK CONTENT Task Detailed Design DELIVERABLE D.7.1 Report on constructive design for the elements of the system
INPUT WP4, report on acceptance criteria and the testing procedures • Design specifications WP5, report on the early design • Design requirements • Material specifications WP6, concept verification and optimization • Variations for configuration • Scale factors / scale errors • Loads and stresses on structures and in cables • Accelerations and movements WP8, deployment and operational procedures • Variations for configuration
INPUT PARTNERS IFR (1) • Material definition • Equipment CYBERNETIX, CYX (2) • Positioning system in deep water SIRENHA SNA (5) • Buffer bell • Connection concepts • Anchoring system ISI (1)
OUTPUT WP7, report on constructive design for the elements of the system • Static and dynamic calculation of the configuration, 3D-model • Material definition • Detailed design of the elements • Dome • Anchorages • Riser Tube • Buffer Bell • Connections
CHAPTERS REPORT D.7.1. Report on constructive design of elements of the system Executive summary • Introduction • Functional requirements (content WP5) • Starting Points Design • Design requirements (content WP5) • Design specifications (content WP4) • Conceptual design • Configuration / mechanical characteristics of the materials / forces on system • Detailed numerical modelization • Models to be used • Modelling approach to elements (buffer bell / riser tube / dome / anchoring / connections) • Results of models • Detailed constructive design