Dome Hazard Analysis DiscussionJacques SebagT&S Systems EngineerApril 10, 2014 Second Safety Council Meeting April 10 and 11, 2014 | LSST Project Office N550
Introduction • Hazard Analysis Process (covered by Chuck Gessner) • Focus on Dome Hazard Worksheet • JIRA Action Example • Hazard Mitigations • Incorporation in the Dome Baseline Design • High Level Hazards linked with Project Risk Registry
Dome Hazard Distribution (Before Mitigation) Dome hazards distributed into 4 categories Dome hazard distribution: Category vs Risk Level
Dome Serious Level Hazards (Before Mitigation) Power ON during maintenance Shutter closure not possible Glass Safety Dome/Crane Motion and Platform Lift
Three Mitigation Types: Interlock, Design, Procedure JIRA Action LIT-104: Create the full list of Safety Procedure Mitigations
Design Mitigation Incorporation Exterior Top Platform Dome Maintenance Platform Access walkways Ladder System
Ladder Systems with Intermediate Platforms and Safety Cable Safety Cable Intermediate Platforms
Interface between Fixed and Rotating Ladders and Ducts 3” between ladders Height: 11’ Duct Interface to be designed by Dome vendor
Safety Tie Off Points for Light/Wind Screen Maintenance Light/Wind Screen (upper) Tie Off Points Access walkways Ladder for Roof Access
Dome Exterior Top Platform Upper Aperture Shutter Doors
Dome Exterior Top Platform Access Hatch Sliding Hatch