350 likes | 590 Views
2013. The Objective: Eskom’s Billion Kilowatt Hour Savings Project. The Energy Gap ( TWh ). Source: Eskom Corrie Visagie 11 Aug 2010. 300. Electricity used to be abundant & cheap we now have a situation of rising prices & shortages of supply
E N D
The Energy Gap (TWh) Source: Eskom Corrie Visagie 11 Aug 2010 300 Electricity used to be abundant & cheap we now have a situation of rising prices & shortages of supply The shortage of electricity will last for at least 5 years The introduction of the Energy Conservation Scheme is essential & imminent (penalties) 290 Energy Required 279.75 280 273.17 265.44 270 We are here EnergyGap 258.58 270.31 If all new capacity comes online 250.42 260 258.63 250 252.25 250.86 Supply 249.69 Supply Available 240 2010 2011 2012 2013 2014
INSTALL ELECTRO SENSEOCCUPANCY SENSORS YOU DON’T GET MORE EFFICIENT THAN OFF!
Occupancy Sensors Established in 1959 Established in 1987 NADE – Istanbul / Turkey
Lighting Retro-Fit • T.8. to T.5. Conversion • Magnetic to Warm Start Electronic ballasts • 50watt dichroic to 6watt LED or CFL • New Light fittings
ELECTRO SENSEELECTRONIC WARM START BALLAST LIGHTING RETROFIT T.8. TO T.5. • 5 Foot (58W) - 5 Foot (35W) • 4 Foot (35W) - 4 Foot (28W) • 2 Foot (18W) - 2 Foot (14W) • 50Watt Dichroic - 6Watt C.F.L./ L.E.D
WHAT’S THE DIFFERANCE? • Security PIR • 10 switching zones • Bulk motion detection • Occupancy sensor • Over 1400 switching zones • Fine finger movement VS
HOW DO THEY WORK? • PIR - Passive Infrared • Heat detection • Microphonics • Listens to sounds • Hi-Frequency • Senses movement
STANDARD BANK PARKADE AFTER BEFORE
Rand Merchant Bank BEFORE AFTER
Installation Lights plug into power in ceiling. Install the Sensor Install the adapter
Lights plug into the adapter. The sensor plugs back into the same power in the ceiling. Plug & Play installation takes an average of 15minutes
ELECTRO SENSE • Founders of Occupancy Sensor Technology in South Africa • Over 5,000,000m2 of space under sensors • 9 years of sensor technology experience • Installed over 60, 000 occupancy sensors • Performed over 90, 000 lighting retrofits • Eskom ESCO: 11048558 • Offices in: • Johannesburg | Boston | Sydney | London
AWARDS • Energy Company of the year 2006 • from the Southern African Association for Energy Efficiency (SAEE) • 2006 & 2007 eta Awards – Electro Sense • For Energy Efficiency Commercial Category • Endorsed by the Department of Minerals and Energy & Eskom • 2008 eta Awards – Magnet • A Business Partner selling our system • 2009 eta Awards – RMB • A client using our system
ESKOM – ELECTRO SENSEBUSINESS PARTNERS • ESKOM - Megawatt Park – Executive Boardrooms (Andrew Etzinger) • ESKOM - Western Cape Region (LodineRedelinghuys) • ESKOM - Eastern Cape Region (Giles Alexander) • ESKOM – North West Region – Free State (Stephen Koopman) • ESKOM – Central Region - Braamfontein (Koos van Rooyen)
ESKOM – REGIONALELECTRICITY SAVINGS North West Region – 5 Eskom Buildings Bloemfontein (Eskom Centre & Freepen Building) Kimberly (Trust Centre & Blanckenbergvlei) Benoni (Lakeview) 402 Kilowatts demand reduction R865 000 p.a
ESKOM – REGIONALELECTRICITY SAVINGS Central Region – 3 Eskom Buildings Braamfontein Klerksdorp Mmabatho (Mafekeng) 596 Kilowatts demand reduction R565 000 p.a
ESKOM – REGIONALELECTRICITY SAVINGS Eastern Cape – 27 Eskom Buildings Port Elizabeth East London 404 Kilowatts demand reduction R880 000 p.a
CASE STUDY - STANLIB Independently verified by Tshwane University A massive 45.5% Savings
Thank you • For more information, please contact • Peter Little • peter@electrosense.co.za • 082 467 1118