400 likes | 1.01k Views
Compliance JEOPARDY!. Test Your Storm Water Knowledge!. JEOPARDY!. Final Jeopardy. General Permit. Acronyms. Definitions . Pollution Control. Monitoring. Documentation and Reporting. 100. 100. 100. 100. 100. 100. 100. 200. 200. 200. 200. 200. 200. 300. 300. 300. 300.
E N D
Compliance JEOPARDY! Test Your Storm Water Knowledge!
JEOPARDY! Final Jeopardy General Permit Acronyms Definitions Pollution Control Monitoring Documentation andReporting 100 100 100 100 100 100 100 200 200 200 200 200 200 300 300 300 300 300 300 400 400 400 400 400 400 500 500 500 500 500 500
The California regulation governing industrial storm water discharges.
The federal law that the Storm Water Industrial General Permit comes from.
The number code used to determine who needs a storm water General Permit.
The form required to be submitted to the State to begin coverage under the General Permit.
Daily Double!!! ACSCE
Any discharge to a storm sewer system that is not composed entirely of storm water.
A point at which storm water or non-storm water leaves a facility.
A document that stays with a storm water sample and records information about a sampling event and what analyses are required.
A storm that produces enough precipitation to cause runoff (usually a minimum of 1/10th of an inch), proceeded by at least 3 days of dry weather, and occurring during normal daylight business hours.
The plan the General Permit requires to identify and control pollution in storm water discharges.
The plan the General Permit requires which describes the storm water monitoring program.
Identify & evaluate sources of pollution and identify and implement Best Management Practices.
Structures, treatment systems, schedules of activities, prohibitions of practices, maintenance procedures, and other management practices used to prevent or reduce storm water pollutants.
Daily Double!!! The two categories of BMPs are described in a SWPPP.
Any discharge or signs of a discharge of anything other then storm water.
Form 2 (authorized non-storm water), and Form 3 (unauthorized non-storm water)
The document and attachments required to be submitted to the State Water Resources Control Board by July 1st.
Final Jeopardy Category Best Management Practices
Final Jeopardy Number one most effective and lowest cost BMP
Thank you for playingCompliance JEOPARDY! You Passed the Test!