1 / 21

MICE Integration Engineering

MICE Integration Engineering. Jason Tarrant - STFC Contents Device Interfaces – General AFC Spectrometer Solenoids RFCC EMR / KL South Mezzanine (summary). MICE Integration Engineering. Device Interfaces - General. MICE centre to grouted in plate = 1649 mm 120 mm, rolling platform

flynn-salas
Download Presentation

MICE Integration Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Integration Engineering Jason Tarrant - STFC • Contents • Device Interfaces – General • AFC • Spectrometer Solenoids • RFCC • EMR / KL • South Mezzanine (summary)

  2. MICE Integration Engineering • Device Interfaces - General • MICE centre to grouted in • plate = 1649 mm • 120 mm, rolling platform • 1515 mm, base to centre • = 14 mm min shim • Shim to take up height • and clocking (rotation) • deviations

  3. MICE Integration Engineering • AFC • Geometry • Tesla support system modifications = suspension system turrets changed (model received 3/7/11) 1534! Asked to change back to 1515

  4. MICE Integration Engineering • AFC • Geometry • Hydrogen Safety Vacuum Line clash with South Mezzanine Raised floor height Old floor height

  5. MICE Integration Engineering Clash with rails Clash with support leg AFCs not shown so vacuum pipe run can be seen

  6. MICE Integration Engineering Beams cut back Raised & narrowed floor section (removable but H system parts temporarily moved) Support leg moved to next beam Cut required in floor panel around vacuum pipe

  7. MICE Integration Engineering • Spectrometer Solenoid • Interface with rolling platforms Mismatch with latest model

  8. MICE Integration Engineering • Spectrometer Solenoid • Interface with rolling platforms Bolted Interface with adjustment?

  9. MICE Integration Engineering • Spectrometer Solenoid • Geometry Port close to mezzanine Rotate for convenience?

  10. MICE Integration Engineering • Spectrometer Solenoid • Geometry Brackets not align with latest model

  11. MICE Integration Engineering • RFCC Ports to be moved? 1m walkway (0.8m min) Mezzanine to be shortened locally & raised (poss. whole length to prevent trip hazard? Services tray to be moved

  12. MICE Integration Engineering • RFCC Width of walkway < 800mm (localised) Gas panel Ports to be moved to opposite side Mezzanine narrowed & raised at front Services tray replacement (need water pipe move)

  13. MICE Integration Engineering • RFCC

  14. MICE Integration Engineering • EMR

  15. MICE Integration Engineering Beams cut back • Mezzanine & EMR Floor plates removed Hydrogen frame clash (work postponed)

  16. MICE Integration Engineering Potential clash With support pillars • Mezzanine & EMR Step VI Step V June 2011 Step IV Beams cut back Support legs moved Removable floor section

  17. MICE Integration Engineering • South Mezzanine change summary • Move 4 of 5 support legs to another beam • Fit cross beam between support legs to support intermediate beams before cutting intermediates • Fit removable platform sections spanning between support leg beams • Higher & narrower than current mezzanine (avoids RFCC & AFC pipe line) • Outer beam = kick plate • Rail with dog leg fitted to outer beam

  18. MICE Integration Engineering • South Mezzanine change summary

  19. MICE Integration Engineering • South Mezzanine change summary Hydrogen supply Removable sections Cut beams Existing mezzanine Moved supports Fixed cross beam (supports Intermediate beams)

  20. MICE Integration Engineering • South Mezzanine change summary

  21. MICE Integration Engineering • South Mezzanine – Before change! • Is the narrow walkway acceptable for safety? • Can the H system frame & pipes be raised to give headroom? • Is the raised floor compatible with the hydrogen racks? • What needs to be installed / moved along the mezzanine walkway? Is it compatible? • Structurally OK? Can H system frame / pipes be temporarily re- moved to move platforms?

More Related