An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA

  2. COMPETENCES • THE MINISTRY • THE EXECUTIVE AGENCY • THE REGIONAL INSPECTORATES • THE RIVER BASIN DIRECTORATES

  3. INTEGRATED PERMITS AND BAT PREVENTIVE LEGISLATION • PREVENTIVE ACTIVITIES BASED ON BAT • PERMIT CONDITIONS BASED ON BAT • BREFs IN THE PERMITS • SITE SPECIFIC BAT • BREF DATA BASE • NATIONAL GUIDELINES DATA BASE

  4. BREF GUIDELINES INSUFFICIENCES IN: • BREF KNOWLEDGE • BAT DETERMINATION GUIDANCE • USE OF DIRECTIVE’S ANNEX 4 CONSIDERATIONS • FAST “FULL SWING” IMPLEMENTATION • APPLICATION PREPARATION PRESSURE • ISSUE OF THE RELEVANT BREFs

  5. PLANNING OF GUIDELINES CRITERIA APPLIED • NUMBER OF THE OPERATIONAL INSTALLATIONS • COMPLEXITY OF THE INSTALLATIONS • DEADLINES FOR APPLICATION • POTENTIAL ENVIRONMENTAL IMPACT • CURRENT LEVEL OF MANAGEMENT

  6. PLANNING OF GUIDELINES ISSUED GUIDELINES • ORGANIC CHEMISTRY • INORGANIC CHEMISTRY • LARGE COMBUSTION PLANTS • SURFACE TREATMENT IN VATS OVER 30m3 • CEMENT CLINKER PRODUCTION

  7. PERMIT’S GUIDELINES ISSUED: • APPLICATION PREPARATION/ALTERNATIVES COMPARISON • PERMIT ISSUE – PROCEDURE • PERMIT’S CONTROL + ANNUAL REPORT • BROCHURE IN PREPARATION: • MINIMUM SCOPE OF EACH CONDITION

  8. EMISSION LIMIT VALUES • MANDATORY SECTORAL LIMITS • DISPERSION MODELS • BAT CAPABILITIES

  9. BULGARIAN APPROACH TO BAT IN THE PERMITTING PRESENTED BY BOYKO MALINOV