90 likes | 111 Views
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING. BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA. COMPETENCES. THE MINISTRY THE EXECUTIVE AGENCY THE REGIONAL INSPECTORATES THE RIVER BASIN DIRECTORATES. INTEGRATED PERMITS AND BAT. PREVENTIVE LEGISLATION
E N D
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA
COMPETENCES • THE MINISTRY • THE EXECUTIVE AGENCY • THE REGIONAL INSPECTORATES • THE RIVER BASIN DIRECTORATES
INTEGRATED PERMITS AND BAT PREVENTIVE LEGISLATION • PREVENTIVE ACTIVITIES BASED ON BAT • PERMIT CONDITIONS BASED ON BAT • BREFs IN THE PERMITS • SITE SPECIFIC BAT • BREF DATA BASE • NATIONAL GUIDELINES DATA BASE
BREF GUIDELINES INSUFFICIENCES IN: • BREF KNOWLEDGE • BAT DETERMINATION GUIDANCE • USE OF DIRECTIVE’S ANNEX 4 CONSIDERATIONS • FAST “FULL SWING” IMPLEMENTATION • APPLICATION PREPARATION PRESSURE • ISSUE OF THE RELEVANT BREFs
PLANNING OF GUIDELINES CRITERIA APPLIED • NUMBER OF THE OPERATIONAL INSTALLATIONS • COMPLEXITY OF THE INSTALLATIONS • DEADLINES FOR APPLICATION • POTENTIAL ENVIRONMENTAL IMPACT • CURRENT LEVEL OF MANAGEMENT
PLANNING OF GUIDELINES ISSUED GUIDELINES • ORGANIC CHEMISTRY • INORGANIC CHEMISTRY • LARGE COMBUSTION PLANTS • SURFACE TREATMENT IN VATS OVER 30m3 • CEMENT CLINKER PRODUCTION
PERMIT’S GUIDELINES ISSUED: • APPLICATION PREPARATION/ALTERNATIVES COMPARISON • PERMIT ISSUE – PROCEDURE • PERMIT’S CONTROL + ANNUAL REPORT • BROCHURE IN PREPARATION: • MINIMUM SCOPE OF EACH CONDITION
EMISSION LIMIT VALUES • MANDATORY SECTORAL LIMITS • DISPERSION MODELS • BAT CAPABILITIES
BULGARIAN APPROACH TO BAT IN THE PERMITTING PRESENTED BY BOYKO MALINOV